Laserfiche WebLink
BLACK BOX <br /> City of Everett, WA:VoIP Consulting Statement of Work <br /> City of Everett, WA. <br /> 1. Executive Overview and Project Objective <br /> The City of Everett, Washington is upgrading their NEC SV8500 to a NEC SV9500.To accomplish this goal Black <br /> Box Network Services will assist in the configuration of voice VLAN's, 40S settings and scripting.This will be <br /> done remotely for the EMB data center and Fire administration building.This consulting engagement will allow <br /> the city of Everett's engineers to rollout configurations to their remaining networks. <br /> 2.Scope and Approach <br /> To aid the City of Everett with recommendations to the Cisco network environment, Black Box will: <br /> • Participate in discovery and design discussions to uncover the needs and goals of the changes to the <br /> network <br /> • Ask questions and work to understand the business needs the City of Everett to provide <br /> recommendations for areas to improve <br /> • Provide configuration advice and best practices for VolP implementation <br /> • Manage the overall engagement and schedule with a Project Manager <br /> 3. Deliverables <br /> • Aid in configuration of EMB data center and Fire administration building <br /> • Aid in the production of scripting for rollout to the rest of the buildings <br /> 4.Assumptions <br /> • The timeline and cost estimates included in this SOW are based in part on the following project <br /> assumptions. Any changes to these assumptions may necessitate a change in the project timeline <br /> and/or cost <br /> 4..1. Black 13ox Network Services Responsibilities <br /> To ensure the high quality and success of the engagement, Black Box Network Services will: <br /> • Engage a remote engineer with the required technical capabilities and experience in equipment <br /> configurations implementation and specifically in the technologies included in this project <br /> • Provide the proper levels of project management including but not limited to status reporting, and <br /> problem, issue, and risk management <br /> • Work with City of Everett,WA throughout the engagement to meet objectives and to complete the <br /> process on time and in alignment with expressed needs and goals <br /> 4,2. City of Everett, WA Responsibilities <br /> Contributions from City of Everett,WA are expected to include: <br /> • Providing access to appropriate IT resources, IT staff and other applicable staff to complete the project <br /> in a timely manner <br /> • Provide a single point of contact for project coordination, approvals, and scheduling <br /> 5. Project Change Control and Completion Procedure <br /> Page 2 November 30, 2020 <br /> Black Box Network Services - www.blackbox.com <br />