My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RRJ Company LLC 4/7/2021
>
Contracts
>
Capital Contract
>
RRJ Company LLC 4/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 8:43:25 AM
Creation date
4/23/2021 11:18:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
RRJ Company LLC
Approval Date
4/7/2021
Council Approval Date
3/10/2021
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Emma Yule Park
Public Works WO Number
PW 2020-064-R1
Tracking Number
0002869
Total Compensation
$1,064,181.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
RRJ Company LLC 2/23/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
RRJ Company LLC 8/17/2022 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> Revised 2021-01-19— <br /> Addendum No. 1 <br /> for further explanation and shall comply with such explanation. In the event of doubt or question arising <br /> respecting the true meaning of the Specifications or Drawings, Contractor shall refer to the Owner's <br /> Representative for his or her decision. <br /> The Specifications may vary in form, format and style. Some specification sections are written in varying <br /> degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. <br /> Omissions of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or"as <br /> specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by <br /> inference. Similar types of provisions may appear in various parts of a section or articles within a part <br /> depending on the format of the section. The Contractor shall not take advantage of any variation of form, <br /> format or style in making claims for extra Work. <br /> The cross referencing of specification sections under the subparagraph heading "Related Sections include <br /> but are not necessarily limited to:" and elsewhere within each specification section is provided as an aid <br /> and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and <br /> shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete <br /> Project whether or not the cross referencing is provided in each section or whether or not the cross <br /> referencing is complete. <br /> Reference to standards,specifications,manuals,or codes of any technical society,organization, or <br /> association, or to Laws or Regulations,whether such reference be specific or by implication, shall mean <br /> the standard, specification,manual, code,or Laws or Regulations in effect at the time of opening of Bids <br /> (or on the Effective Date of the Agreement if there were no Bids),except as may be otherwise specifically <br /> stated in the Contract Documents. <br /> No provision of a standard,specification,manual or code, or an instruction of a Supplier shall be effective <br /> to change the duties or responsibilities of Owner, Contractor,or Owner's Representative, or their <br /> Subcontractors,consultants, agents, or employees from those set forth in the Contract Documents.No <br /> such provision or instruction shall be effective to assign to Owner,or Owner's Representative, or their <br /> related entities, any duty or authority to supervise or direct the performance of the Work or any duty or <br /> authority to undertake responsibility inconsistent with the provisions of the Contract Documents. I <br /> 2.2. DIVISION OF SPECIFICATIONS AND DRAWINGS <br /> Specifications and Drawings are divided into groups for convenience. These divisions are not for the <br /> purpose of apportioning Work or responsibility for Work among Subcontractors, Suppliers and <br /> manufacturers. The Contractor is responsible for all Work shown or described,regardless of location(s) <br /> in the Contract Documents. <br /> 2.3. DISCREPANCIES IN SPECIFICATIONS AND DRAWINGS <br /> 2.3.1. Errors and Omissions <br /> If the Contractor,in the course of the Work,becomes aware of any errors or omissions in the Contract 1 <br /> Documents or in the Owner's field work,he or she shall immediately inform the Owner's Representative <br /> in writing. The Owner's Representative will promptly review the matter and if he or she finds an error or <br /> omission has been made,then he or she will determine the corrective actions and advise the Contractor <br /> accordingly. If the corrective work associated with an error or omission significantly increases or <br /> decreases the amount of Work called for in the Contract,the Owner will issue an appropriate Change <br /> Order. After discovery by the Contractor of an error or omission,related work performed by the <br /> Contractor shall be done at its risk unless authorized by the Owner's Representative and approved by the <br /> Owner. Omissions from the Drawings or Specifications or the misdescription of details of Work that are <br /> manifestly necessary to carry out the intent of the Drawings and Specifications, or that are customarily <br /> performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the 111 <br /> Work,but they shall be performed as if fully and correctly set forth and described in the Drawings and <br /> Specifications. a <br /> General Conditions—007200-6 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.