My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RRJ Company LLC 4/7/2021
>
Contracts
>
Capital Contract
>
RRJ Company LLC 4/7/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2023 8:43:25 AM
Creation date
4/23/2021 11:18:54 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
RRJ Company LLC
Approval Date
4/7/2021
Council Approval Date
3/10/2021
Department
Parks
Department Project Manager
Mark Harrison
Subject / Project Title
Emma Yule Park
Public Works WO Number
PW 2020-064-R1
Tracking Number
0002869
Total Compensation
$1,064,181.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
RRJ Company LLC 2/23/2023 Change Order 2
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
RRJ Company LLC 8/17/2022 Change Order 1
(Contract)
Path:
\Records\City Clerk\Contracts\10 Years Then Transfer to State Archivist\2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
419
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Revised 2021-01-19— <br /> Addendum No. 1 <br /> Unabsorbed Overhead: The reduction or loss of contribution to recovery of the Contractor's Overhead <br /> costs realized by the result of reduced Project or Contractor billings,or both, due to any reason <br /> whatsoever, including a Project extension. <br /> Unit Price Work: Refers to items of Work identified by unit prices in the bid form. <br /> Work: Refers to the Project and the labor,materials,Equipment,supplies,services, and other items <br /> necessary for the execution,completion and fulfillment of the Contract. <br /> 1.2. CONTRACT DOCUMENTS <br /> The complete Contract includes: <br /> 1. Federal requirements that apply to this Contract and Project; <br /> 2. Supplemental agreements between Owner and Contractor,if any, subsequent to the Owner's <br /> execution of the Contract; <br /> 3. Addenda; <br /> 4. The Contract; <br /> 5. Specifications, including,but not limited to,these General Conditions and other numbered <br /> Documents and Sections; <br /> 6. Supplementary Conditions, if any; <br /> 7. Drawings; <br /> 8. Change Orders; <br /> 9. City of Everett standard plans in effect as of the date Bids are opened; <br /> 10. Instructions to Bidders; <br /> 11. Contractor's completed Bid Form; and <br /> 12. Certifications and affidavits as required by this Contract and by law. <br /> These parts complement each other in describing the complete Work. Any requirement in one part binds <br /> as if stated in all parts. The Contractor shall provide any work or materials clearly implied in the Contract <br /> even if the Contract does not mention it specifically. Any inconsistency in the parts of the Contract shall <br /> be referred to the Owner's Representative attention for a determination of the intended requirements. <br /> The Work required in one part must be furnished even if not mentioned in other parts of the Contract. If <br /> any part of the Contract requires Work that does not include a description for how the Work is to be <br /> performed,the Work shall be performed in accordance with standard trade practice(s). For purposes of <br /> the Contract,a standard trade practice is one having such regularity of observance in the trade as to justify <br /> ' an expectation that the Contractor will follow or observe the practice in performing the Work. In case of <br /> any ambiguity, disagreement or Dispute over interpreting the Contract,the Owner's Representative's <br /> decision will be final as provided in these General Conditions. <br /> Approved Shop Drawings,other Contractor's Submittals,and the reports and drawings of subsurface and <br /> physical conditions are not Contract Documents. <br /> 2. SPECIFICATIONS AND DRAWINGS <br /> 2.1. INTERPRETATION OF SPECIFICATIONS AND DRAWINGS <br /> The Specifications and Drawings are intended to be explanatory and supportive of each other. Work <br /> specified on the Drawings and not in the Specifications,or vice versa, shall be executed as if specified in <br /> both. In the event the Work to be done or matters relative thereto are not sufficiently detailed or <br /> explained in the Contract Documents,the Contractor shall immediately ask the Owner's Representative <br /> General Conditions—007200-5 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.