Laserfiche WebLink
Revised 2021-01-19— <br /> Addendum No. 1 <br /> 3. If a trustee or receiver is appointed for Contractor,or for any of Contractor's property. <br /> 4. If Contractor files a petition to take advantage of any debtor's law,or to reorganize under any <br /> bankruptcy chapter or law. <br /> 5. If Contractor repeatedly fails to make prompt payments to Subcontractors or others for labor, <br /> materials, or Equipment. <br /> 6. If Contractor disregards laws, ordinances,rules,regulations, or orders of any public body having <br /> jurisdiction. <br /> 7. If Contractor disregards the authority of the Owner or Owner's Representative. <br /> 8. If Contractor violates in a substantial way the provisions of the Contract Documents or fails, <br /> neglects,or refuses to proceed in compliance with the provisions of the Contract Documents. <br /> 9. If the Contractor made material misrepresentations to the Owner with respect to: (a) its <br /> qualifications or those of its Subcontractors; (b) its or its subcontractors' ability to perform the <br /> Work in a timely,workmanlike manner; (c)the materials installed or to be installed; or(d) <br /> progress pay estimates. <br /> 10. If Contractor fails to supply sufficient skilled workers or suitable materials or equipment. <br /> ' 11. If Contractor refuses or fails to prosecute the Work with such diligence as will ensure its Physical <br /> Completion within the original Physical Completion time and any extensions of time which may <br /> have been granted to the Contractor by change order or otherwise.' <br /> 12. If Contractor disregards laws,ordinances,rules,codes,regulations, orders or similar requirements <br /> of any public entity having jurisdiction. <br /> 13. If Contractor performs Work which deviates from the Contract,and neglects or refuses to correct <br /> rejected Work. <br /> 14. If Contractor otherwise violates in any material way any provisions or requirements of the <br /> ' Contract. <br /> After termination of the Contractor for default,the Owner may transfer performance of the Work to the <br /> Contractor's surety. The Owner may exclude the Contractor from the Site and take possession of the <br /> Work and all of the Contractor's tools,appliances, owned or rented construction equipment,and <br /> machinery at the Site and use the same to the full extent they could be used by the Contractor. The <br /> Owner may incorporate in the Work all materials and Equipment stored at the Site or for which the <br /> Owner has paid the Contractor,but which are not yet on Site. In such case,the Contractor will not be <br /> entitled to receive any further payment until the Work is finished. At the Owner's sole option, Contractor <br /> shall assign and transfer any contractual rights to material and Equipment to be installed, incorporated, or <br /> used in the performance of the Work. Owner shall credit Contractor for the reasonable fair market rental <br /> value of any and all Contractor owned equipment for so long as retained and used by the Owner. Owner <br /> shall credit Contractor for all materials and supplies on Site or on order,but not yet paid for by Owner, <br /> provided that ownership is transferred and assigned to the Owner and the materials and supplies conform <br /> to the requirements of the Contract Documents. <br /> If the unpaid balance of the Contract Sum exceeds the direct and indirect cost of the completed Work, <br /> including construction management services, such excess shall be paid to the Contractor. If such costs <br /> exceed such unpaid balance,the Contractor shall pay the difference to the Owner. Such costs incurred by <br /> the Owner will be verified by the Owner's Representative and incorporated into a Change Order, but in <br /> finishing the Work,the Owner may negotiate for materials,Equipment and services to complete the Work <br /> and will not be required to obtain the lowest figure for Work performed. <br /> I <br /> General Conditions—007200-19 <br /> I <br />