My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell Inc. 3/3/2021 Amendment 2
>
Contracts
>
6 Years Then Destroy
>
2022
>
Brown and Caldwell Inc. 3/3/2021 Amendment 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 2:05:05 PM
Creation date
4/23/2021 2:04:54 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell Inc.
Approval Date
3/3/2021
Council Approval Date
8/27/2019
End Date
12/31/2022
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
2020 Water Filter Plant Facilities Plan
Amendment/Change Order
Amendment
Amendment/Change Order Number
2
Tracking Number
0001991
Total Compensation
$209,683.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
effluent piping, etc.) and modifications to filter operations that will meet the City's <br /> plant productivity target. Qualitative advantages/disadvantages will be summarized <br /> for these options and will be presented to the City during a virtual workshop. <br /> o Pending feedback from the City on preferred options, BC will perform an alternatives <br /> analysis on two selected alternatives for improvements. A third alternative, <br /> consisting of plant production if no improvements are made beyond filter re-rating <br /> (e.g. increasing filtration rates from 8 to 10 gpm/sf)will be presented as a baseline. <br /> Budget-level capital cost estimates will be developed for each alternative, along with <br /> description of necessary modifications to filter operations. Each alternative will <br /> include recommendations for <br /> • Provide recommendations for timeline and scope of recommended necessary plant <br /> improvements, process changes, etc.that should be implemented as a part of the rerating <br /> strategy. <br /> Everett Responsibilities <br /> • Provide copy of Pilot Work Plan and/or Interim or Final Pilot Study Reports as they become <br /> available. <br /> • Identify plant production targets/operating scenarios to be achieved via filter re-rating. <br /> • Provide review comments and other input to BC on rerating engineering submittal. <br /> Task Assumptions <br /> • BC's efforts will focus on assessment of the effects that re-rating will have on WFP <br /> hydraulics,processes (e.g. backwash, chem feed, rec. water pond pumps and pond level, <br /> etc.), and net filter production. BC will not evaluate potential impacts to finished water <br /> quality resulting from re-rating. <br /> • Communications with WSDOH are not requested at this time. <br /> Meetings <br /> • Assume 2 coordination and review virtual workshops, lasting 2 hours each and attended by 3 <br /> BC staff. <br /> Work Products <br /> • Technical memorandum summarizing analysis findings, with the necessary level of detail per <br /> DOH rerating guidelines for inclusion in a report the City will prepare and submit to DOH. <br /> Estimated page count is 10 to 20 pages, not including front end (e.g.,table of contents, list <br /> of figures, etc.)and appendices. <br /> Page 8 of 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.