My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/04/28 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/04/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2021 9:18:49 PM
Creation date
4/28/2021 1:50:23 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/28/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Jackson Park Area Stormwater Separation <br />Change Order No.; 001 <br />Change Order Effective Date: April 4, 2021 <br />Contractor and City agree as follows: <br />1. The scope of Work shall be changed to the extent described in Exhibit A. <br />2. In full and complete compensation for the changes described in Exhibit A, <br />including all direct and indirect costs and impacts, the contract price shall be <br />adjusted as described in this Change Order. <br />3. The duration of the Contract shall be adjusted to the extent described in this <br />Change Order. <br />4. Contractor waives and releases any and all claims arising out of, or related to, this <br />Change Order, the work described in Exhibit A, and all work and actual or <br />constructive changes that occurred or began prior to the date of this Change Order, <br />including, but not limited to, claims for equitable adjustment of time and <br />compensation, delay, impact, overhead, or inefficiencies. This provision does not <br />apply to requests for equitable adjustment of time or price for which the Contractor <br />timely and properly provided notice of a differing site condition, protest, dispute, <br />claim or Contract Claim as required by the Contract Documents. If the Contract <br />Documentsestablish a time period for notice of a differing site condition, protest, <br />dispute, claim, or Contract Claim that ends after the date of this Change Order, but <br />relates to work performed prior to the date of this Change Order, then this provision <br />does not apply if the Contractor timely and properly submits such notice <br />5. This Change Order only changes the contract between Contractor and City to the <br />extent explicitly provided herein. <br />M. <br />CITY <br />Mayor <br />Date • <br />Attest: Approved As to Form: <br />City Clerk City Attorney <br />Date: Date: <br />Recommended By: <br />Construction <br />Manager (if <br />applicable) <br />Date: 4at3-24 <br />Project Engineer (if Engineering <br />applicable) Manager (if <br />app icable) <br />Date: <br />Department Director <br />ate- 1 /r :_ 2- D.te: 'f-l&-ZC&-( <br />CONTRACTOR <br />w <br />By <br />Officer <br />Date" <br />�12-,2,r <br />Page 2of3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.