Laserfiche WebLink
Exhibit A —Description of Changed Work <br />Project: Jackson Park Area Stormwater Separation <br />Change Order No.; 001 <br />Change Order Effective Date: April 4, 2021 <br />Modified Existing Bid Items <br />Bid Item 9 Crushed Surfacing Base Course. Modify existing item 9 by adding 400 Tons of Crushed <br />Surfacing Base Course at the unit price of $90.00/Ton resulting in a $36,000.00 increase to the Contract, <br />Bid Item 26 Post Construction Soil Quality and Depth. Modify existing item 26 by adding 1,250 <br />SY of Post Construction Soil Quality and Depth at the unit price of $40.00/SY resulting in a $50,000.00 <br />increase to the Contract. <br />Bid Item 27 — HMA CL 1/2" PG 64-22 for Permanent Trench Patch. Modify exist ngitem 27 byadding <br />g <br />550 Tons HMA CL 1/2" PG 64-22 for Permanent Trench Patch at the unit price of $220.00/Ton resulting <br />in a $121,000.00 increase to the Contract. <br />Added Bid Items <br />New Item 101 — CSTC for Pipe Bedding. Add 950 Tons of new item # 101 entitled, "CSTC for Pipe <br />Bedding" at the agreed unit price $60.00/Ton, resulting in a $57,000.00 increase to the Contract. <br />Exhibit B Justificatjon <br />Bid Items 9, 26 & 38 — Crushed Surfacing Base Course, Post Construction Soil Qualityand Depth <br />and HMA CL '/2" PG 64-22 for Permanent Trench Patch. These items represent work required for <br />restoration after pipe installation. Each item over -ran the plan quantity. <br />New Item 101 — CSTC for Pipe Bedding. The contractor requested utilization CSTC in lieu of CSBC <br />for pipe bedding This new item was created to formalize the revision including a reduction in the unit <br />price from $90.00/Ton to $60.00/ton. <br />Exhibit C Additional Contract Time: <br />There are no additional working days added for this change order. <br />Page 3of3 <br />