Laserfiche WebLink
SUPPLEMENTAL AGREEMENT NO. 2 <br />To <br />PROFESSIONAL SERVICES AGREEMENT <br />This agreement entered into this day of 2021, by and between the City of <br />Everett, a municipal corporation under the laws of the State of Washington (City) and <br />Murraysmith, Inc. (Contractor) [Formerly Murray, Smith & Associates, Inc.]. <br />Witneseth: <br />Whereas the City and Contractor entered into an agreement February 1st, 2017, entitled <br />Professional Services Agreement" (Agreement) between the City of Everett and Murray, Smith <br />& Associates, Inc. to provide engineering service for the pre -design of reservoir 2 replacement <br />project. <br />Whereas the City and Contractor, on January 16, 2019 amended the Agreement with <br />supplemental Agreement No. 1 for the purpose of providing additional engineering services for <br />the design of the reservoir 2 replacement project including the following major categories of work <br />tasks: Project Management, City coordination, Public Outreach Support, Permitting Support, <br />Final Design and Bidding Support and Undefined Services. <br />Whereas the City and Contractor desire to supplement the Amended Agreement for the purpose <br />of providing engineering services during construction of the replacement of reservoir. <br />Now therefore, the City and Contractor do mutually agree as follows: <br />All provisions in the Agreement and Supplemental Agreement No. 1 shall remain in effect <br />except as expressly modified by this supplement. The changes to the Agreement and the <br />Supplemental Agreement No. 1 are described as follows: <br />Amend the previous "Exhibit A, Scope of Services", "Exhibit Al Scope of Services, Phase 2 <br />— Final Design and Bidding", by adding: "Exhibit A2 Scope of Services, Phase 3 — <br />Construction Support Services". <br />Amend the previous "Exhibit B, Compensation", "Exhibit B1 Project hours, Expenses and <br />Fee Estimate" by adding "Exhibit B2 Project hours, Expenses and Fee Estimate". <br />Modify Paragraph 3. Time of Beginning and Completion of Performance, by deleting the <br />existing sentence and replacing with the following sentence: <br />"This Agreement shall commence as of the date of execution of this Agreement and <br />shall be completed by December 31, 2023." <br />Modify Paragraph 4. Compensation, subparagraph D, which describes the maximum total <br />compensation, by deleting the existing sentence and replacing with the following sentence: <br />"Total compensation, including all services and expenses, shall not exceed a <br />maximum of One Million Eight Hundred Forty Thousand Three Hundred Eighty - <br />Three Dollars ($1,840,383)". This amounts to an increase of $600,640. <br />1 of 2 <br />