My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/04/28 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/04/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2021 9:18:49 PM
Creation date
4/28/2021 1:50:23 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/28/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`EVERETT <br />City Council Agenda Item Cover Sheet <br />Project title: Supplemental Agreement 2 to the Professional Services Agreement with Murraysmith, Inc. to Provide <br />Design Services During Construction for the Replacement of Reservoir 2 Project <br />Council Bill # <br />Agenda dates requested: <br />April 28, 2021 <br />Briefing <br />Proposed action <br />Consent <br />Action X <br />Ordinance <br />Public hearing <br />Yes <br />X No <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />Supplemental Agreement 2 <br />Department(s) involved: <br />Public Works <br />Contact person: <br />Souheil Nasr <br />Phone number: <br />425-257-2710 <br />Email: <br />snasr@everettwa.gov <br />Initialed by: <br />2LS <br />Department head <br />Administration <br />Council President <br />Project: <br />Partner/Supplier: <br />Location: <br />Preceding action: <br />Fund: <br />Replacement of Reservoir 2 <br />Murraysmith, Inc. <br />702 Edwards Ave (Rucker Hill, adjacent to Jackson Elementary School) <br />Award to Walsh Construction Company II, LLC <br />336 — Water/Sewer System Improvements <br />Fiscal summary statement: This project is included in the current Public Works Capital <br />Improvements Program for Water infrastructure with project funding of $22,100,000. <br />Summary of Professional Service Agreement (PSA) with MurrySmith: <br />• PSA with Murraysmith (Predesign): $ 393,135 <br />• Supplemental Agreement 1 (Design): $ 846,608 <br />• Supplemental Agreement 2 (Construction Period): $ 600,640 (This Action) <br />Total PSA: $1,840,383 <br />Project summary statement: On April 21, 2021 the Council awarded the construction <br />contract for the replacement of reservoir 2 to the Walsh Construction Company. <br />Professional Service Agreement Supplemental Agreement 2 is for design services during <br />construction. <br />Recommendation (exact action requested of Council): Authorize the Mayor to sign <br />Supplemental Agreement No 2 with Murraysmith, Inc to Provide Design Services During <br />Construction for the Replacement of Reservoir 2 in the amount of $600,640. <br />
The URL can be used to link to this page
Your browser does not support the video tag.