My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/04/28 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/04/28 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2021 9:18:49 PM
Creation date
4/28/2021 1:50:23 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
4/28/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A2 <br />SCOPE OF SERVICES <br />CITY OF EVERETT <br />REPLACEMENT OF RESERVOIR 2 <br />WORK ORDER #UP3658 <br />PHASE 3 — CONSTRUCTION SUPPORT SERVICES <br />Background <br />Murraysmith, Inc. (Consultant) has developed the following scope of services and accompanying <br />fee estimate to provide services during construction of the Replacement of Reservoir 2 project. <br />The scope and fee have been developed based on discussions with City of Everett (City) staff and <br />our understanding of the project. <br />Project Approach <br />The engineering services to be provided by Consultant will be accomplished using a phased <br />approach, as follows. <br />• <br />III <br />NI <br />Phase 1 Preliminary Design (completed) <br />Phase 2 Final Design and Bidding (near completion) <br />Phase 3 Construction Support Services (this scope of work) <br />Based on this approach, the scope of services and fee estimate for the Phase 3 work program are <br />detailed herein. <br />Project Understanding and Assumptions <br />A brief overview of the major proposed improvements is presented below. <br />• <br />ra <br />5.0 MG of storage in two (2) 2 5 MG AWWA D110 Type 1 prestressed concrete reservoirs <br />Approximately 740 LF of steel 36-inch and 48-inch diameter combined inlet water main <br />pipe <br />■ Approximately 3,200 LF of steel 24-inch diameter outlet water main <br />® Approximately 2,700 LF of ductile iron storm and reservoir drainage pipe ranging in size <br />from 6-inch to 24-inch diameter <br />City of Everett VURRAYSMITH Replacement of Reservoir 2 <br />April 2021 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.