Laserfiche WebLink
■ Approximately 1,050 LF of sewer force main <br />® Approximately 1,400-square-foot storage building with small restroom and SCADA room <br />® New valving to connect Transmission Lines 2, 3, and 4 <br />e Demolition of the existing 10 MG open concrete Reservoir 2 and Valve House 2 <br />City and Consultant Roles <br />The City will take the lead role for all construction administration, management, and inspection <br />services during construction of the project. The services to be provided by Consultant during <br />construction and the associated level of effort shown in the fee estimate reflects a supporting role <br />by Consultant. The amount of time and effort that may be required to fulfill the obligations of this <br />Scope of Work is subject to factors beyond the control of Consultant and the City. The projected <br />level of effort proposed herein and included in the fee estimate therefore represents an <br />"estimate" based upon the collective experience of Consultant and the City for an experienced <br />and reasonable contractor being awarded the construction contract and completing all <br />construction work within the construction schedule. <br />Scope of Services <br />The Scope of Services for construction support services is divided into the following work tasks. <br />• <br />e <br />e <br />e <br />e <br />Task 301 <br />Task 302 <br />Task 303 <br />Task 304 <br />Task 305 <br />Task 306 <br />Task 307 <br />Task 308 <br />Task 309 <br />Project Management and Coordination <br />Permitting Support <br />Pre -construction Conference and Construction Meetings <br />Shop Drawings and Submittals Review <br />Requests for Information and Change Orders <br />On -call Construction Observation Support <br />Project Start -Up <br />Operation and Maintenance Manuals <br />Record Drawings <br />Task 310 — Subconsultant Services <br />Task 311 - Supplemental Services Management Reserve <br />301. Project Management and Coordination <br />Work under this task includes organizing, managing, and coordinating the services required to <br />provide the identified construction support services with City staff and general project <br />management. <br />City of Everett <br />April 2021 <br />G:1PDX BD\CIients\Everett, WA\Reservoir 2 9-16 (16-1910)1Scope-Fee-Contract\Const. Supt. Serv\Exh A2 - Everett Reservoir 2 Rplcmnt CSS Scope.docx <br />VURRAYSMITH Replacement of Reservoir 2 <br />2 <br />