Laserfiche WebLink
• <br />Complete up to 8 site visits/reports to evaluate foundation subgrade and to confirm <br />exposed soil conditions are as assumed during design. Provide design consultation and <br />foundation preparation recommendations based on the actual conditions encountered, <br />including over excavation of unsuitable soils and placement of foundation materials, as <br />appropriate. <br />Observe activities during demolition of the existing Reservoir 2 concrete liner and provide <br />recommendations regarding suitability of demolition for long-term drainage and site use. <br />310.2 Structural Engineering <br />Peterson Structural Engineers (Peterson) to provide structural engineering services consisting of <br />the following: <br />Attend a pre pour meeting <br />■ Perform up to 7 structural observation site visits/reports for each reservoir <br />■ Perform up to 4 structural observation site visits/reports for the storage building <br />• Up to 80 hours for review and response to construction submittals. <br />■ UP to 70 hours for review and response to construction RFIs. <br />■ Prepare structural record drawings <br />310.3 Electrical Engineering <br />R&W Engineering (R&W) will provide electrical engineering services consisting of the following: <br />Attend a virtual pre -construction conference, up to 1 on -site meeting, and up to 1 site visit <br />to review construction progress and answer contractor questions. <br />Review of 1 set of original electrical submittals and up to 1 set of resubmittals. <br />® Review electrical portions of other equipment <br />® Review up to 5 RFls and up to 2 change orders <br />■ Attend final walk-through and prepare electrical punch list <br />■ Review electrical portions of O&M manual submittals <br />. Prepare electrical record drawings <br />City of Everett <br />April 2021 <br />G:1PDX BD\CIients\Everett, WA\Reservoir 2 9-16 (16-1910)1Scope-Fee-ContractlConst. Supt. Serv\Exh A2 - Everett Reservoir 2 Rplcmnt CSS Scope.docx <br />VURRAYSMITH Replacement of Reservoir 2 <br />10 <br />