310.4 Corrosion Engineering <br />Northwest Corrosion Engineering will provide corrosion engineering services consisting of the <br />following: <br />• Address RFI's and submittal review <br />■ Provide 2 days on -site inspection during installation of cathodic protection equipment <br />■ Provide review and comment regarding contractor supplied system commissioning data <br />General correspondence and teleconference meetings. <br />311. Unanticipated Labor or Expenses <br />Provide additional services not explicitly included in the scope of services as may be required for <br />this phase of the project, as requested and authorized by the City. Consultant will provide a fee <br />estimate for additional services requested by the City. The City will provide written authorization <br />to proceed with any additional services. <br />Estimated Schedule <br />Construction is anticipated to start in June 2021 Based upon the contract duration of 495 working <br />days, it is estimated that construction will be completed in May or June of 2023. Record drawings <br />g <br />and O&M manuals will be completed approximately two months later based on estimated receipt <br />p <br />of all final consolidated construction markups within one month after construction completion. <br />Fee Estimate <br />The detailed fee estimate for Phase 3 is provided in Exhibit B2. <br />City of Everett <br />April 2021 <br />G:1PDX BD\CIients\Everett, WA\Reservoir 2 9-16 (16-1910)1Scope-Fee-Contract\Const. Supt. Serv\Exh A2 - Everett Reservoir 2 Rplcmnt CSS Scope.docx <br />VURRAYSMITH Replacement of Reservoir 2 <br />11 <br />