My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> ' CITY OF EVERETT SPECIAL PROVISIONS <br /> In the event of termination for convenience,the Contractor shall be compensated as provided <br /> in 1-09.5 DELETED OR TERMINATED WORK. The Contractor will be entitled to no further <br /> ' payments whatsoever for the Work. <br /> In the event of a breach or default by the Contractor, City may, at its sole option, terminate <br /> this Contract in whole or in part for convenience as provided herein. The City may pursue <br /> ' any and all contractual, legal and equitable remedies for such breach or default. Absent an <br /> express written agreement to the contrary, a termination for the City's convenience shall not <br /> be deemed a waiver or release of any rights by the City nor shall the City be estopped from <br /> any legal or equitable remedies that may be appropriate. <br /> Supplement 1-08.10 by adding the following: <br /> 1-08.10(6) Termination by Contractor after Suspension <br /> If the Work has been wholly suspended pursuant to 1-08.6 SUSPENSION OF WORK for more <br /> than 90 calendar days as measured from the date of the Notice to suspend, then the Contractor <br /> may terminate this Contract by providing City with 14 calendar days' Notice that the Contractor <br /> shall deem the Contract to be terminated if the City does not provide Contractor with notice to <br /> resume Work within those 14 calendar days. Such termination shall be treated as a termination <br /> for the City's convenience pursuant to 1-08.10(2)TERMINATION FOR PUBLIC CONVENIENCE. <br /> 1-08.10(7) Contractor Obligations upon Termination <br /> On receipt of notice of termination, the Contractor shall immediately discontinue the Work but <br /> shall do such Extra Work as may be ordered by the City's Representative or City to safeguard <br /> the Work then completed and the materials and Equipment then delivered to the site of the Work <br /> and to leave the Work in a safe and useful condition. Payment for this Extra Work will be made <br /> ' in accordance with 1-09.4 EQUITABLE ADJUSTMENT. <br /> 1-08.10(8) Ownership of Materials upon Termination <br /> (******) <br /> As of the termination date, whether effected by the City or Contractor as provided herein, all the <br /> Contractor's right, title, and interest in and to materials ordered by the Contractor prior to <br /> termination, whether or not they have been delivered to the site of Work, shall be vested in the <br /> City, and the Contractor shall, upon demand of the City, execute and deliver to the City all requisite <br /> bills of sale, assignments, and other documents of transfer that may be necessary to give effect <br /> to the intention of the termination procedures set forth above. <br /> ' 1-08.10(9) Opportunity to Cure <br /> (******) <br /> If the Contractor has not already had an opportunity to cure the default or breach the City shall <br /> ' specify the default or breach and a reasonable period of time to allow the Contractor to cure the <br /> default or breach. The Notice of termination will state the time period in which cure is permitted <br /> and other conditions as the City, in its sole judgment, shall deem appropriate. If Contractor fails <br /> to remedy the breach or default or any of the terms, covenants, or conditions of this Contract to <br /> the City's satisfaction within the time period specified or the City shall have the right to terminate <br /> the Contract without any further obligation to the Contractor. Any such termination for default <br /> shall not in any way operate to preclude the City from also pursuing all available remedies against <br /> Contractor and its sureties for said breach or default. <br /> 1-08.10(10) Waiver of Remedies for Any Breach <br /> (******) <br /> In the event that the City elects to waive its remedies for any breach by Contractor or any <br /> covenant, term or condition of this Contract, such waiver by the City shall not limit the City's <br /> SEI to SRI Intertie,SRO8 Rehab Division 1 —GENERAL REQUIREMENTS WO No.—UP3714 <br /> SP—101 <br />
The URL can be used to link to this page
Your browser does not support the video tag.