My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> prepared on the basis of certified weight tickets delivered to the City's Inspector at time of delivery I <br /> of materials. Tickets not received by the City's Inspector on day of delivery will not be honored <br /> for payment. <br /> 1-09.3 Scope of Payment <br /> Supplement 1-09.3 by adding the following: <br /> 1-09.3(1) Schedule of Values 1 <br /> (******) <br /> The Contractor shall submit a Schedule of Values in accordance with 1-08.0(1) PRE- <br /> CONSTRUCTION CONFERENCE. If the Project contains Unit Price Work, in whole or in part, <br /> then the Schedule of Values for that portion of the Work shall also be based on unit prices. If the <br /> Proposal Form calls for a lump sum price, in whole or in part, then the Schedule of Values shall: <br /> reasonably allocate the Contract Sum among the various portions of the Work; be complete; be <br /> organized to include detailed breakdown of each major unit of the Work; be organized to <br /> correspond to Contractor's schedule; break down the Contract Sum showing the value assigned <br /> to each part of the Work; include an allowance for profit and Overhead; include Unit Price Work, <br /> if and to the extent indicated on the Proposal Form; be so organized as to facilitate assessment <br /> of Work and payment of Subcontractors; and be balanced. To the greatest extent possible, the <br /> breakdown shall use the same tasks or units as the Contractor's schedule. Contractor shall <br /> provide documentation substantiating the cost allocation if asked by the City's Representative. I <br /> Upon acceptance of the Schedule of Values by the City's Representative, it shall be used as a <br /> basis for all requests for payment. <br /> 1-09.4 Equitable Adjustment , <br /> Supplement 1-09.4 by adding the following: <br /> Other means to establish the reasonable cost of the Work not defined by unit prices include, and <br /> is not limited to, 1-09.6 FORCE ACCOUNT, the Schedule of Values, or estimating manuals. <br /> 1-09.4(1) General <br /> (******) <br /> The following shall apply in determining the amount of an equitable adjustment of Contract Sum: <br /> 1. Except as otherwise expressly provided, Contractor will only be paid for costs it clearly <br /> and convincingly proves it actually and directly incurred and shall not include <br /> consequential or indirect damages not otherwise expressly permitted by the Contract <br /> Documents. Costs and damages for which the City shall not be liable under any <br /> circumstances include, but are not limited to: (a) borrowing or interest costs, charges, <br /> or expenses of Contractor; (b) alleged lost profit or overhead on any other project; and <br /> (c) Contractor's failure or inability to obtain other work. <br /> 2. No Contract Claim for adjustment of Contract Sum or additional compensation for <br /> extra, affected, impacted or inefficient work will be allowed where the Contractor does <br /> not keep and maintain contemporaneous, complete and accurate time records for <br /> labor and equipment and contemporaneous, complete and accurate records for <br /> materials and where such records do not contemporaneously segregate and allocate <br /> by time, location and Work the time and costs for each item or element of such Work. <br /> Contractor's failure to keep and maintain such records constitutes a waiver of any <br /> Contract Claim or request by the Contractor for adjustment of Contract Sum for such <br /> costs or event. <br /> 3. To the extent the Contractor is entitled to an adjustment of Contract Sum due to any <br /> Delay or extension of Contract Time, Contractor shall be compensated as provided in <br /> 1-09.11A REMEDIES. Such compensation shall be full, adequate and complete <br /> compensation for all direct, indirect, cumulative, inefficiency, impact and ripple costs <br /> causing, arising out of, or relating to such Delays or extension. <br /> SEI to SRI Intertie,SRO8 Rehab Division 1 -GENERAL REQUIREMENTS WO No.-UP3714 <br /> SP-104 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.