I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Id. Horizontal and vertical locations of underground utilities and appurtenances, shall be <br /> referenced to monumentation. The monumentation shall be based on NAD 83-91 for <br /> I Horizontal Datum and NAVD 88 for Vertical Datum. <br /> e. Any changes in centerline profile and curb & gutter (top of curb), offsets and <br /> elevations. <br /> I f. Details, Equipment or materials used that were not shown on the original Plans. <br /> g. The actual arrangement and routing of conduit, embedded conduit, raceways and <br /> piping relative to its location and proportioned to other work. The location needs to be <br /> I dimensioned on the record drawings. <br /> h. Contractor prepared piping schematics and diagram drawings representing the <br /> Equipment orientation. <br /> I i. Final location of all surface and subsurface improvements. <br /> j. Record on the drawings the location of all field run materials. <br /> k. All shoring systems left in place at the end of construction. <br /> I Contractor shall accurately show existing underground items including, but not limited to, piping, <br /> manholes, pull boxes, conduit, direct buried wire, foundations, equipment and obstructions found <br /> during construction on the record drawings. Note on the record drawings the actual size of all <br /> I utilities and structures and types of material used. Locate all record drawing items by survey <br /> coordinates or dimensioned off NAD 83-91 for Horizontal Datum and NAVD 88 for Vertical Datum. <br /> Minimum requirements for accuracy are specified in the following chart. <br /> IDescription Horizontal Elevation Notes <br /> Location <br /> I <br /> Gravity sewer and Coordinates, I.E. 0.01 ft. Recalculate actual slopes. <br /> drain lines stations, and All inverts in manholes. <br /> offsets 0.1 ft. All angle changes. <br /> I <br /> Forcemains, Coordinates I.E. 0.1 ft. Record all angle points and <br /> watermains and and stations finished ground elev. <br /> transmission lines 0.1 ft. Above the invert elev. <br /> I All other items, 0.1 ft. 0.1 ft. Show dimensions on <br /> incl. Electrical and record drawings. <br /> Structural <br /> I <br /> Use red pen or pencil to make changes on the record drawings. Notations are to be neat, legible, <br /> clear and concise. <br /> Record information concurrently with the progress of construction. Conceal no work until the <br /> Irequired information is verified and recorded. <br /> 1-08.11(3) Payment <br /> No separate payment shall be made for the preparation of record drawings. All costs associated <br /> I <br /> with the preparation of record drawings shall be included in the unit contract prices of other items <br /> in the Contract. <br /> I 1-09 MEASUREMENT AND PAYMENT <br /> 1-09.1 Measurement of Quantities <br /> Supplement 1-09.1 by adding the following: <br /> 1 Measurement by the Ton: Where items are specified to be paid for by the ton it will be the <br /> Contractor's responsibility to see that a certified weight ticket is given to the City's Inspector on <br /> the Project at the time of delivery of materials for each truckload delivered. Pay quantities will be <br /> I SEI to SRI Intertie,SRO8 Rehab Division 1 -GENERAL REQUIREMENTS WO No.-UP3714 <br /> SP-103 <br />