Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> ' a. Labor <br /> b. Materials <br /> ' c. Direct Equipment. The actual cost for each piece of equipment for which <br /> a Contract Claim is made or in the absence of actual cost, the rates <br /> established by the AGC/WSDOT Equipment Rental Agreement that was <br /> ' in effect when the Work was performed. In no case shall the amounts <br /> sought or paid for each piece of equipment exceed the rates established <br /> by the Equipment Rental Agreement even if the actual cost for such <br /> equipment is higher. The City may audit the Contractor's cost records to <br /> determine actual equipment cost. The following information shall be <br /> provided for each piece of equipment: <br /> i. Detailed description (e.g., Motor Grader Diesel Powered <br /> Caterpillar 12 "G", Tractor Crawler ROPS & Dozer Included <br /> Diesel, etc.) <br /> ii. The hours of use or standby; and <br /> iii. The specific day and dates of use or standby; <br /> iv. Job overhead. <br /> v. Overhead (general and administrative). <br /> ' vi. Subcontractor's Contract Claims (in the same level of detail as <br /> specified herein is required for any subcontractor's Contract <br /> Claims); and <br /> vii. Other categories as specified by the Contractor or the City. <br /> 10. A notarized statement shall be submitted to the City's Representative containing <br /> the following language: <br /> ' Under the penalty of law for perjury or falsification, the undersigned, <br /> (name) (title) <br /> of <br /> (company) <br /> hereby certifies that the Contract Claim for extra compensation and extension <br /> of Contract Time, if any, made herein for Work on this Contract is a true and <br /> complete statement of the factual basis of the Contract Claim and all actual <br /> costs incurred and time sought, and is fully documented and supported under <br /> the Contract between the parties. <br /> ' Date /s/ <br /> Subscribed and sworn before me this day of <br /> Notary Public <br /> ' My Commission Expires: <br /> 1-09.11(2)C False or Omitted Information <br /> The Contractor waives each Contract Claim for which it presents material information that it <br /> ' knows, or in the exercise of reasonable care should know, is false, or omits or fails to disclose <br /> material information relating to such Contract Claim. In such case, Contractor shall <br /> reimburse the City for any and all fees and expenses incurred in investigating any such <br /> Contract Claim. <br /> ' SEI to SRI Intertie,SRO8 Rehab Division 1 -GENERAL REQUIREMENTS SP-113 WO No.-UP3714 <br />