My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS I <br /> 1-11.10 Effective Date 125 <br /> 1-11.11 Contractor Registration 125 <br /> DIVISION 2 - EARTHWORK 127 I <br /> 2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP 127 <br /> 2-01.4 Measurement 127 I <br /> 2-01.5 Payment 127 <br /> 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS 127 <br /> 2-02.1 Description 127 I <br /> 2-02.3 Construction Requirements 127 <br /> 2-02.4 Vacant 129 <br /> 2.02.4 Measurement 129 I <br /> 2-02.5 Payment 130 <br /> 2-03 ROADWAY EXCAVATION AND EMBANKMENT 130 <br /> 2-03.1 Description 130 I <br /> 2-03.2 Vacant 130 <br /> 2.03.2 Materials 130 <br /> 2-03.3 Construction Requirements 130 I <br /> 2-03.4 Measurement 131 <br /> 2-03.5 Payment 131 <br /> 2-04 HAUL 131 <br /> 2-04.1 Description 131 <br /> 2-04.3 Vacant 132 <br /> 2-04.3 Construction Requirements 132 I <br /> 2-04.4 Measurement 132 <br /> 2-04.5 Payment 132 I <br /> 2-07 WATERING 132 <br /> 2-07.3 Construction Requirements 132 <br /> 2-07.4 Measurement 133 <br /> 2-07.5 Payment 133 <br /> 2-09 STRUCTURE EXCAVATION 133 <br /> 2-09.2 Materials 133 1 <br /> 2-09.3 Construction Requirements 133 <br /> 2-09.4 Measurement 134 <br /> 2-09.5 Payment 134 I <br /> 2-11 TRIMMING AND CLEANUP 134 <br /> 2-11.3 Construction Requirements 134 <br /> 2-11.4 Vacant 134 <br /> 2-11.4 Measurement 134 <br /> 2-11.5 Payment 135 I <br /> DIVISION 6 - STRUCTURES 137 <br /> 6-03 STEEL STRUCTURES 137 <br /> 6-03.4 Measurement 137 <br /> 6-03.5 Payment 137 <br /> DIVISION 7 - DRAINAGE STRUCTURES, STORM SEWERS AND SANITARY SEWERS 139 <br /> 7-04 STORM SEWERS 139 I <br /> SEI to SRI Intertie, SRO8 Rehab Table of Contents WO No.-UP3714 <br /> SP-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.