My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I CITY OF EVERETT SPECIAL PROVISIONS <br /> 7-04.1 Description 139 <br /> 7-04.2 Materials 139 <br /> I <br /> 7-04.4 Measurement 139 <br /> 7-04.5 Payment 140 <br /> I 7-05 MANHOLES, INLETS, AND CATCH BASINS 140 <br /> 7-05.1 Description 140 <br /> 7-05.2 Materials 140 <br /> I 7-05.3 Construction Requirements 140 <br /> 7-05.4 Measurement 142 <br /> 7-05.5 Payment 142 <br /> I 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS 142 <br /> 7-08.1 Description 142 <br /> 7-08.2 Materials 142 <br /> I 7-08.3 Construction Requirements 143 <br /> 7-08.4 Measurement 146 <br /> 7-08.5 Payment 146 <br /> I 7-17 SANITARY SEWERS 146 <br /> 7-17.1 Description 146 <br /> 7-17.1 Description 146 <br /> I7-17.2 Materials 146 <br /> 7-17.3 Construction Requirements 147 <br /> 7-17.4 Measurement 147 <br /> I <br /> 7-17.5 Payment 148 <br /> 7-20 SANITARY SEWER FORCEMAINS (******) 148 <br /> I 7-20.1 Description 148 <br /> 7-20.1 Description 148 <br /> 7-20.2 Materials 148 <br /> I 7-20.3 Construction Requirements 148 <br /> 7-20.4 Measurement 150 <br /> 7-20.5 Payment 150 <br /> I DIVISION 8 - MISCELLANEOUS CONSTRUCTION 152 <br /> 8-01 EROSION CONTROL 152 <br /> 8-01.1 Description 152 <br /> I 8-01.2 Materials 152 <br /> 8-01.3 Construction Requirements 152 <br /> 8-01.4 Measurement 156 <br /> I 8-01.5 Payment 156 <br /> 8-04 CURBS, GUTTERS AND SPILLWAYS 156 <br /> 8-04.1 Description 156 <br /> I8-04.2 Materials 156 <br /> 8-04.3 Construction Requirements 156 <br /> 8-04.4 Measurement 157 <br /> I <br /> 8-04.5 Payment 157 <br /> 8-05 VACANT 157 <br /> I 8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES 157 <br /> SEI to SRI Intertie,SROB Rehab Table of Contents WO No.-UP3714 <br /> SP-8 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.