Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> ' DIVISION 2 -- EARTHWORK <br /> 2-01 CLEARING, GRUBBING AND ROADSIDE CLEANUP <br /> 2-01.4 Measurement <br /> 1 Delete all paragraphs of 2-01.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as described <br /> in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-01.5 Payment <br /> Delete all paragraphs in 2-01.5 and substitute the following: <br /> ' Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> ' If there is no bid item to cover clearing and grubbing, then the cost of work for clearing and <br /> grubbing shall be included in the bid price provided for associated work in which compensation <br /> shall be considered made in its entirety. <br /> ' 2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS <br /> 2-02.1 Description <br /> Delete 2-02.1 and substitute the following: <br /> ' The Work shall consist of the removal, disposal or abandoning in-place of various existing <br /> improvements including, but not limited to, pavements, brick or concrete structures, pipe, curbs, <br /> curb and gutter, gutter, valves, manholes, catch basins and other items necessary for the <br /> ' accomplishment of the improvement. <br /> All Work with asbestos-cement pipe shall conform to the "Recommended Standard Asbestos- <br /> Cement Pipe Work Practice Procedure and Training Requirements," latest edition, as published <br /> by the American Water Works Association, Pacific Northwest Section. Remove and dispose of <br /> Asbestos-Cement pipe in accordance with the practices specified by the State of Washington <br /> Department of Ecology and the Snohomish County Solid Waste Division. <br /> 2-02.3 Construction Requirements <br /> 2-02.3(2) Removal of Bridges, Box Culverts and Other Drainage Structures <br /> Supplement 2.02.3(2) by adding the following: <br /> ' When removing structures such as manholes, inlets, or vaults that interfere with the <br /> construction, properly plug all pipe openings abandoned in-place watertight with Commercial <br /> Concrete, or with mortar and masonry, blocks or brick. <br /> Backfill voids with suitable job excavated material where structures are removed. Compact <br /> suitable backfill material in accordance with 2-03.3(14)C. <br /> If the Engineer determines the job-excavated material unsuitable for backfill then Contractor <br /> ' shall obtain Gravel Borrow or CDF as directed, to complete backfilling the voids. If a pay <br /> item for Gravel Borrow or CDF is not included in the Proposal, then providing Gravel Borrow <br /> or CDF for backfill shall be considered as Extra Work under 1-04.4. <br /> ' 2-02.3(3) Removal of Pavement, Sidewalks, Curbs, and Gutters <br /> Delete 2-02.3(3) and substitute the following: <br /> ' SEI to SRI Intertie,SRO8 Rehab Division 2-EARTHWORK WO No.-UP3714 <br /> SP-127 <br />