Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 2-02.3(3) Removal of Existing Street Improvements <br /> (******) <br /> 2-02.3(3)A Description <br /> The Work shall consist of the removal and disposal of various existing improvements <br /> including, but not limited to, pavements, curb, curb and gutter, gutter and other items <br /> necessary for the accomplishment of the improvement. <br /> 2-02.3(3)B Removal of Pavement <br /> Remove full depth existing permanent type pavement and driveway pavement shown on the <br /> Plans or as directed by the Engineer. <br /> Replace, at no expense to the City, existing pavement designated to remain that is damaged <br /> during the pavement or concrete base removal. <br /> 2-02.3(3)B1 Sawcutting , <br /> Make vertical full depth saw cut between existing asphalt concrete pavement, to remain <br /> and the portion to be removed. <br /> Where asphalt concrete pavement overlays cement concrete pavement base, saw cut <br /> in accordance with 2-02.3(6) Sawing and Line Drilling. <br /> 2-02.3(3)C Removal of Curb, Curb and Gutter <br /> Remove existing curbs where shown on the Plans or where encountered in the Work and <br /> designated by the Engineer. <br /> Existing curb and gutter include, but is not limited to, cement concrete, cement concrete curb <br /> with a brick gutter and a cement concrete back, or other combinations of rigid materials. <br /> Remove the entire curb and gutter section, regardless of material composition. <br /> 2-02.3(3)C1 Sawcutting <br /> Make vertical full depth saw cut between existing curb or curb and gutter to remain and <br /> the portion to be removed. <br /> 2-02.3(3)D Removal of Cement Concrete Sidewalks <br /> Concrete slabs that average four inches or less in thickness will be considered as sidewalk <br /> removal. <br /> Protect existing concrete walk that is to remain in place, from equipment damage by using <br /> planking or cover with rock free eight-inch thick blanket of excavated soil. <br /> Provide Engineer with proposed pavement breakers before use and do not begin breaking <br /> pavement without Engineer's approval of the pavement breakers. <br /> 2-02.3(3)D1 Sawcutting <br /> Make vertical full depth saw cut between existing cement concrete sidewalk to remain <br /> and the portion to be removed at the nearest scribe marks beyond the neat line limits, <br /> or to the nearest joint. <br /> No diagonal cuts in sidewalk will be allowed unless otherwise indicated on the Plans or <br /> directed by the Engineer. <br /> 2-02.3(3)E Removal of Catch Basins, Manholes, Inlets or Sumps <br /> Excavate and completely remove the structure including, but not limited to, casting and outlet <br /> trap, concrete encasement and bricks, as applicable to each removal item listed in the <br /> Proposal. <br /> Plug existing connecting pipes that remain by filling with Commercial Concrete a minimum <br /> length of 24—inches into the pipe. Backfill shall be Gravel Borrow as specified in 9-03.14(1). <br /> Compact backfill to a minimum of 95 percent maximum density in accordance with 2- <br /> 03.3(14)D. <br /> SEI to SRI Intertie,SRO8 Rehab Division 2-EARTHWORK WO No.-UP3714 <br /> SP-128 <br />