Laserfiche WebLink
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> ' 6. City water utility will fine Contractor for violation of these requirements. Contractor <br /> shall also be liable for damage suits resulting from malfunctioning of Contractor <br /> ' damaged fire hydrants not being operational in the event of fire. <br /> 7. There will be no charge for the volume of water used. <br /> 2-07.4 Measurement <br /> Revise 2-07.4 to read as follows: <br /> Water will not be measured. <br /> 2-07.5 Payment <br /> Revise 2-07.5 to read as follows: <br /> All costs for the Work described in Section 2-07 shall be included with the Work with no direct <br /> ' compensation made. <br /> 2-09 STRUCTURE EXCAVATION <br /> 2-09.2 Materials <br /> ' Supplement 2-09.2 by adding the following at end of the materials list: <br /> Foundation Material Class A or B 9-03.17 Standard Specifications <br /> ' 2-09.3 Construction Requirements <br /> 2-09.3(1) General Requirements <br /> 2-09.3(1)C Removal of Unstable Base Material <br /> ' Delete all paragraphs in 2-09.3(1)C and substitute the following: <br /> When the material at the bottom of an excavation is not stable enough to support the <br /> Structure, the Contractor shall excavate below grade to the depth required by the <br /> ' Engineer and replace the unstable material with Foundation Material Class A or B. <br /> Place Foundation Material Class A or B in layers not more than six inches thick and <br /> compact to minimum of 90-percent maximum density as determined by 2-03.3(14)D. <br /> ' Dispose of unsuitable material removed to make room for foundation material by hauling <br /> to a waste site obtained and provided by the Contractor in accordance with 2-03.3(7)C. <br /> 2-09.3(1)D Disposal of Excavated Material <br /> Delete the second paragraph in 2-09.3(1)D and substitute the following: <br /> All costs for disposing of excavated material, whether within the Project limits or hauled <br /> to a disposal site, shall be incidental to the other Bid items in the Proposal. The City will <br /> not pay for hauling. Disposal of excavated material shall meet the requirements of 2- <br /> 03.3(7)C. <br /> 2-09.3(1)E Backfilling <br /> ' Delete the fourth paragraph in 2-09.3(1)E and substitute the following: <br /> Provide CDF having minimum 28-day strength of 50 psi and maximum 28-day strength <br /> not to exceed 300-psi. Provide wet or flowable CDF with consistency having <br /> approximate slump between three to ten inches. <br /> Controlled Density Fill used for excavation backfill may be placed dry or wet. Use wet, <br /> or flowable, CDF for filling abandoned pipes in-place. <br /> Supplement 2-09.3(1)E by adding the following: <br /> Where CDF is used in lieu of other materials such as foundation material, gravel borrow, <br /> washed sand or crushed surfacing top course, the respective limits for trench width or <br /> backfill dimensions shall be approved by the Inspector. <br /> ' SEI to SRI Intertie,SROB Rehab Division 2-EARTHWORK WO No.-UP3714 <br /> SP-133 <br />