My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 2-09.3(3)B Excavation Using Open Pits — Extra Excavation <br /> Revise the sixth paragraph to read as follows: <br /> Submittals and Design Requirements—The Contractor shall submit Type 3E Working ' <br /> Drawings with supporting calculations showing the geometry and construction <br /> sequencing of the proposed excavation slopes. <br /> 2-09.3(3)D Shoring and Cofferdams ' <br /> Revise the fifth paragraph to read as follows: <br /> Submittals and Design Requirements—The Contractor shall submit Type 3E Working <br /> Drawings with supporting calculations showing the proposed methods and construction <br /> details of structural shoring or cofferdams in accordance with Sections 1-05.3 and 6- <br /> 02.3(16). <br /> 2-09.4 Measurement ' <br /> Delete all paragraphs in 2-09.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as described <br /> in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 2-09.5 Payment <br /> Delete all paragraphs in 2-09.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> When there is no bid item for"Structure Excavation" in the Proposal, all Work in this section shall <br /> be included with the respective Bid Items of the Contract with no direct compensation made. <br /> 2-11 TRIMMING AND CLEANUP <br /> 2-11.3 Construction Requirements <br /> Supplement 2-11.3 by adding the following after item 6: ' <br /> (rr) 7. Keep City streets clean and free from mud, dirt and other debris. <br /> Further supplement 2-11.3 by adding the following: <br /> Keep the Project site in a neat and orderly condition during the process of construction with as <br /> little disruption to the adjoining properties as practical under the conditions. <br /> Promptly and as often as needed cleanup debris resulting from Contractor's operations from <br /> drainage facilities such as inlets, catch basins, culverts and open ditches. <br /> Remove and dispose of all construction stakes. <br /> Upon Project completion, clean Project area and neatly dress slopes to present a uniform <br /> appearance blending into the contour of adjacent properties. Remove trash of all kinds resulting <br /> from construction operations. <br /> 2-11.4 Vacant <br /> Revise 2-11.4 to read as follows: <br /> 2-11.4 Measurement <br /> Delete all paragraphs in 2-11.4 and substitute the following: ' <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as described <br /> in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. I <br /> SEI to SRI Intertie,SRO8 Rehab Division 2-EARTHWORK WO No.-UP3714 <br /> SP-134 <br />
The URL can be used to link to this page
Your browser does not support the video tag.