My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS I <br /> 8-06.1 Description 157 <br /> 8-06.2 Materials 157 <br /> 8-06.3 Construction Requirements 157 I <br /> 8-06.4 Measurement 158 <br /> 8-06.5 Payment 158 <br /> 8-14 CEMENT CONCRETE SIDEWALKS 158 <br /> 8-14.2 Materials 158 <br /> 8-14.3 Construction Requirements 158 I <br /> 8-14.4 Measurement 160 <br /> 8-14.5 Payment 160 <br /> 8-31 LINING 160 I <br /> 8-31.1 Description 160 <br /> 8-31.2 Materials 160 <br /> 8-31.3 Construction Requirements 160 I <br /> 8-31.4 Measurement 166 <br /> 8-31.5 Payment 166 <br /> DIVISION 9 - MATERIALS 168 I <br /> 9-03 AGGREGATES 168 <br /> 9-03.6 Vacant 168 <br /> 9-03.6 Aggregates for Asphalt Treated Base(ATB) 168 <br /> 9-03.22 Sand Backfill for Pipe Zone (******) 169 <br /> 9-04 JOINTS AND CRACK SEALING MATERIALS 169 I <br /> 9-04.12 Watertight Pipe to Manhole Connection Boot (******) 169 <br /> 9-04.13 Flexible Coupling (******) 169 <br /> 9-05 DRAINAGE STRUCTURES, CULVERTS, AND CONDUITS 169 <br /> 9-05.12 Polyvinyl Chloride (PVC) Pipe 169 <br /> 9-05.13 Ductile Iron Sewer Pipe 169 <br /> 9-05.15 Metal Castings 170 I <br /> 9-05.23 High-Density Polyethylene (HDPE) Pipe 170 <br /> 9-06 STRUCTURAL STEEL AND RELATED MATERIALS 171 <br /> 9-06.4 Vacant 171 I <br /> 9-06.5 Bolts and Rods 171 <br /> 9-14 EROSION CONTROL AND ROADSIDE PLANTING 171 <br /> 9-14.1 Soils 171 I <br /> 9-23 CONCRETE CURING MATERIALS AND ADMIXTURES 173 <br /> 9-23.2 Liquid Membrane-Forming Concrete Curing Compounds 173 <br /> 9-23.6 Chemical Admixtures for Concrete 173 <br /> 9-30 WATER DISTRIBUTION MATERIALS 173 <br /> 9-30.2(7) Bolted, Sleeve-Type Couplings for Plain End Pipe 173 I <br /> 9-30.2(12)Wax Tape 173 <br /> 9-30.3(8) Plug Valves 173 <br /> I <br /> SEI to SRI Intertie,SRO8 Rehab Table of Contents WO No.-UP3714 I <br /> SP-9 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.