Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> IAdjust manholes, catch basins and other structures to final grade after completing pavement <br /> operations. Carefully re-establish the center of each structure from Contractor's previously <br /> ' established references. <br /> Cut pavement in neat circle having a minimum diameter of 2-feet beyond the casting cover. <br /> Remove pavement and base material, maintaining the neat circle, to permit casting and <br /> I <br /> frame removal. Adjust casting and frame to proper grade. <br /> Place cast iron frame on concrete blocks or concrete adjusting rings and wedge up to the <br /> desired grade using plastic wedges. Wood or metal wedges are not allowed. The Backfill <br /> I <br /> around finished casting frame to within 1-1/2 inches of finished pavement surface using <br /> commercial concrete. <br /> After concrete has set a full 24-hours, paint the edges of the asphalt concrete pavement and <br /> I <br /> the outer edge of the casting with hot asphalt cement. Place hot asphalt concrete to match <br /> finished pavement surface and compact with hand tampers and a patching roller. Asphalt <br /> concrete and cement concrete shall be considered incidental to the unit price of the structure <br /> I <br /> being adjusted. <br /> Match the new patch with existing paved surface for texture, density, and uniformity of grade. <br /> Carefully paint the joint between the patch and the existing pavement shall then be carefully <br /> painted with hot asphalt cement or asphalt emulsion and immediately cover with dry paving <br /> I <br /> sand before the asphalt cement solidifies. <br /> Thoroughly mortar and plaster the inside throat of the structure. <br /> I 7-05.3(3) Connections to Existing Manholes <br /> Delete all three paragraphs of 7-05.3(3) and substitute the following: <br /> Verify existing manhole rim and invert elevations prior to construction. Provide verification <br /> I documentation by means of a Submittal to the Engineer for approval. Submittal shall be in <br /> accordance with 1-05.3 of these Special Provisions. Immediately bring discrepancies in <br /> invert elevations to the attention of the Engineer. <br /> I Unless specified otherwise, match the new connection pipe crown elevation to the existing <br /> pipe or pipe crown elevation. Rechannel the existing manhole in accordance with COE <br /> Standard Drawing 605A to provide a flow transition free from rough, jagged or protruding <br /> edges that could catch debris. <br /> I <br /> Use safe and effective construction methods to prevent existing manhole from moving or <br /> tipping during excavation to make new connection. <br /> Keep the manhole in operation at all times and take necessary precautions to prevent debris <br /> I <br /> or other material from entering the sewer, including an effective pipeline bypass through the <br /> existing channel, if required. <br /> Core drill concrete as required for pipe connections up to 28-inch O.D. Line drill or wall saw <br /> I an opening for pipe connection greater than 28-inch O.D.to accommodate the size of pipe to <br /> be inserted. Interconnect drilled holes where line drilling is the method used. Use a small <br /> core drill to accomplish line drilling. Jackhammer or rotary hammer shall not be used. For <br /> I line drilling provide minimum 1-inch and maximum 2-inch clearance around the <br /> circumference of the pipe. Core drill opening to accept a watertight flexible pipe to manhole <br /> connection in accordance with manufacturer's recommendations. Place upstream pipes, <br /> except PVC and HDPE pipe, penetrating the manhole walls with the bell facing out and snug <br /> Iagainst the outside wall of the structure as the angle of penetration allows. Provide a flexible <br /> joint within 1/2 of a pipe diameter or 12-inches, whichever is greater for pipe, except PVC <br /> and HDPE pipe, leaving or entering manholes. <br /> I Place pipes entering or leaving the manhole on firmly compacted bedding. Take particular <br /> care in compacting bedding within the area of the manhole excavation that is normally deeper <br /> than the sewer trench. Take special care to ensure the annular opening around each pipe <br /> I SEI to SRI Intertie,SRO8 Rehab Division 7-STORM,SEWER WO No.-UP3714 <br /> SP-141 <br />