Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> entering the manhole is completely and firmly cemented full of non-shrink grout to ensure <br /> water tightness. Non-shrink grout shall conform to requirements of 9-03.20.3(2) of the <br /> Standard Specifications. <br /> Provide a watertight flexible pipe connection fitting to manhole connector pipe diameters less <br /> than or equal to 24-inches for PVC or HDPE pipes connecting to manhole. Place no PVC <br /> or HDPE pipe joint within 10-feet of the outside face of the manhole. <br /> 7-05.3(4) Drop Manhole Connections <br /> Delete the first paragraph in 7-05.3(4) and substitute the following: <br /> Construct outside drop connections where shown on Plans in accordance with these Special <br /> Provisions and 7-04, 7-05, and 7-17 of the Standard Specifications and COE Standard <br /> Drawing No. 608. <br /> Construct inside drop connections where shown on the Plans, or as approved by Engineer, <br /> in 54-inch diameter manholes or larger in accordance with these Special Provisions and 7- <br /> 04, 7-05, and 7-17 of the Standard Specifications and COE Standard Drawing No. 609. <br /> Provide factory installed holes for drop connections for new manholes and core drill holes <br /> for existing manholes. Impact tools shall not be allowed for making holes in manhole walls. <br /> Supplement 7-05.3 by adding the following: <br /> 7-05.3(5) Furnish and Install Solid Lid for Catch Basins ' <br /> (******) <br /> Provide new solid lids on existing catch basins where shown on the Plans. Provide solid lids <br /> conforming to 9-05.15 of the Standard Specifications, 9-05.15(1)of these Special Provisions, <br /> and to COE Standard Drawing No. 406 and 410 for Type 1 and 1-L Catch Basins and COE <br /> Standard Drawing 611 for Type 2 Catch Basins. <br /> 7-05.4 Measurement ' <br /> Delete all paragraphs of 7-05.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as described <br /> in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-05.5 Payment <br /> Delete all paragraphs of 7-05.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS <br /> 7-08.1 Description <br /> Further supplement 7-08.1 as follows: <br /> 7-08.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> Provide Type 3E Working Drawings for dewatering plans, if any. <br /> 7-08.2 Materials <br /> Delete material items listed in 7-08.2 and substitute the following: <br /> Provide materials meeting the following requirements: <br /> Foundation Material Class A or B 9-03.17 Standard Specifications <br /> Gravel Borrow 9-03.14(1) Standard Specifications <br /> SEI to SRI Intertie,SRO8 Rehab Division 7-STORM,SEWER WO No.-UP3714 ' <br /> SP-142 <br /> 1 <br />