My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> entering the manhole is completely and firmly cemented full of non-shrink grout to ensure <br /> water tightness. Non-shrink grout shall conform to requirements of 9-03.20.3(2) of the <br /> Standard Specifications. <br /> Provide a watertight flexible pipe connection fitting to manhole connector pipe diameters less <br /> than or equal to 24-inches for PVC or HDPE pipes connecting to manhole. Place no PVC <br /> or HDPE pipe joint within 10-feet of the outside face of the manhole. <br /> 7-05.3(4) Drop Manhole Connections <br /> Delete the first paragraph in 7-05.3(4) and substitute the following: <br /> Construct outside drop connections where shown on Plans in accordance with these Special <br /> Provisions and 7-04, 7-05, and 7-17 of the Standard Specifications and COE Standard <br /> Drawing No. 608. <br /> Construct inside drop connections where shown on the Plans, or as approved by Engineer, <br /> in 54-inch diameter manholes or larger in accordance with these Special Provisions and 7- <br /> 04, 7-05, and 7-17 of the Standard Specifications and COE Standard Drawing No. 609. <br /> Provide factory installed holes for drop connections for new manholes and core drill holes <br /> for existing manholes. Impact tools shall not be allowed for making holes in manhole walls. <br /> Supplement 7-05.3 by adding the following: <br /> 7-05.3(5) Furnish and Install Solid Lid for Catch Basins ' <br /> (******) <br /> Provide new solid lids on existing catch basins where shown on the Plans. Provide solid lids <br /> conforming to 9-05.15 of the Standard Specifications, 9-05.15(1)of these Special Provisions, <br /> and to COE Standard Drawing No. 406 and 410 for Type 1 and 1-L Catch Basins and COE <br /> Standard Drawing 611 for Type 2 Catch Basins. <br /> 7-05.4 Measurement ' <br /> Delete all paragraphs of 7-05.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as described <br /> in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-05.5 Payment <br /> Delete all paragraphs of 7-05.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS <br /> 7-08.1 Description <br /> Further supplement 7-08.1 as follows: <br /> 7-08.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> Provide Type 3E Working Drawings for dewatering plans, if any. <br /> 7-08.2 Materials <br /> Delete material items listed in 7-08.2 and substitute the following: <br /> Provide materials meeting the following requirements: <br /> Foundation Material Class A or B 9-03.17 Standard Specifications <br /> Gravel Borrow 9-03.14(1) Standard Specifications <br /> SEI to SRI Intertie,SRO8 Rehab Division 7-STORM,SEWER WO No.-UP3714 ' <br /> SP-142 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.