My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I7-08.3(2)J High Density Polyethylene Pipe (HDPE) for Combined Sewer (******) <br /> Provide leak-proof thermal HDPE butt joints, except at field closures and other joint <br /> I <br /> connections specifically identified or approved by the Engineer. Butt weld HDPE joints in <br /> accordance with manufacturer's recommendation and ASTM D 2657. Use tools <br /> recommended by the pipe supplier and approved by the Engineer to fuse joints. Use pipe <br /> I manufacturer trained and certified operators to operate the joint fusing equipment. Provide <br /> fusing machine having hydraulic pressure control for fusing two pipe ends together. <br /> Accurately trim ends of pipe to form perpendicular faces prior to fusing. Provide electrically <br /> I heated and thermostatically controlled heating plate on the fusing machine with a <br /> temperature gauge for monitoring temperature. Subject the heating plate to periodic <br /> inspection, using a temperature stick, to assure even heating. Provide a HDPE flange <br /> I adapter with a 316 stainless steel follower ring having Class 125 flange bolt pattern where <br /> flanged connections are required. <br /> Provide joints between pipe sections free from sharp edges, ridges and depressions on the <br /> inside. Internal projection beads do not need be removed from each pipe joint, unless <br /> I <br /> otherwise noted on the Plans. Provide true alignment at the butt-fused joint between the <br /> joined pipes with uniform roll back beads resulting from the use of proper temperature and <br /> pressure. Allow adequate cooling time before removing pressure from the butt joint. The <br /> I fused joint shall be watertight and shall have tensile strength equal to the pipe. All joints shall <br /> be subject to inspection and acceptance by the City. Cut out and replace all defective joints <br /> at no cost to the City. <br /> I City will not permit threaded or solvent-cement joints and connections. <br /> City will not allow fabrication of fittings in the field. Sleeve couplings, repair bands, <br /> mechanical joints, flanges and other types of pipe connections are not permitted unless <br /> I shown on the Plans or authorized in advance by the Engineer or Inspector. <br /> Construct trench in accordance with 7-08.3(1)A. Place pipe in the trench in accordance with <br /> 7-08.3(2)B and this section. Backfill in accordance with 7-08.3(3) and these Special <br /> Provisions. When backfilling and compacting HDPE pipe, ensure pipe is at the same <br /> temperature as the surrounding soil. Fill pipe with water and anchor HDPE pipe to counteract <br /> buoyancy if flowable CDF is used for bedding or backfill. City will not permit blocking under <br /> I the pipe. <br /> Provide continuous HDPE pipe entering manholes. City will not allow short PVC closure <br /> segments, except where explicitly shown on the Plans or approved by the Engineer. <br /> 7-08.3(3) Backfilling <br /> I Delete the first paragraph of 7-08.3(3) and substitute the following: <br /> Perform trench backfilling only after inspection and approval of the installed pipe bedding <br /> I zone backfill. Refer to COE Standard Drawing No. 614, 615, 620 and the Plans for typical <br /> trench section backfill and compaction requirements. <br /> If the Engineer determines native material is not suitable for use as trench backfill, use <br /> I "Gravel Borrow" conforming to 9-03.14(1) of the Standard Specifications. <br /> If there is an excess of suitable backfill material obtained from trench excavation at one <br /> location on the project, use it at other locations on the project or dispose of at an approved <br /> disposal site. The cost of transporting the excess backfill material is considered incidental <br /> Ito the Contract with no direct compensation made. <br /> Use Controlled Density Fill in lieu of select trench backfill for fill above pipe zone at street <br /> crossings and as directed by the Engineer in other areas where in order to prevent pavement <br /> I <br /> patch settlement requires high density backfill placement or effective backfill compaction is <br /> not possible. <br /> Delete the first sentence of the third paragraph. <br /> I SEI to SRI Intertie,SROB Rehab Division 7-STORM,SEWER WO No.-UP3714 <br /> SP-145 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.