My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Delete the third and fourth sentences of the fourth paragraph. <br /> 7-08.3(4) Plugging Existing Pipe <br /> Delete the first paragraph of 7-08.3(4) and substitute the following: <br /> Where shown on the plans to plug and seal existing water main, sanitary sewer and storm <br /> drainage pipe plug existing pipe a minimum distance of 2-feet from the inlet end with cement <br /> grout and abandon in place. <br /> 7-08.4 Measurement <br /> Delete all paragraphs in 7-08.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as described <br /> in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-08.5 Payment <br /> Delete all paragraphs in 7-08.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-17 SANITARY SEWERS ' <br /> 7-17.1 Description <br /> Revise the first paragraph in 7-17.1 to read as follows: <br /> This Work consists of constructing gravity sanitary or combined sewer mains using conventional <br /> open trench construction methods, as staked, in accordance with the Plans, these Specifications, <br /> and the COE Standard Drawings. <br /> 7-17.1 Description <br /> Supplement 7-12.1 as follows: <br /> 7-17.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> Provide Type 3E Working Drawings for construction of temporary by-passes. <br /> 7-17.2 Materials <br /> Delete list of pipe materials in the first paragraph in 7-17.2 and substitute the following: <br /> Use the following pipe materials for gravity sanitary and combined sewers: I <br /> Rigid Thermoplastic <br /> ABS Composite <br /> Ductile Iron PVC (Polyvinyl Chloride) <br /> Polypropylene <br /> Delete the list of material requirements in 7-17.2 and substitute the following: <br /> Provide materials meeting the following requirements. <br /> Solid Wall PVC Sanitary Sewer Pipe 9-05.12(1) Special Provisions <br /> Profile Wall PVC Sanitary Sewer Pipe 9-05.12(2) Special Provisions <br /> Ductile Iron Sewer Pipe 9-05.13 Special Provisions <br /> ABS Composite Sewer Pipe 9-05.14 Special Provisions <br /> Polypropylene Dual and Triple Wall 9-05.21 Special Provisions <br /> Sanitary Sewer Pipe ' <br /> SEI to SRI Intertie, SRO8 Rehab Division 7—STORM,SEWER WO No.—UP3714 <br /> SP-146 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.