My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as described ' <br /> in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-17.5 Payment <br /> Delete all paragraphs of 7-17.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and Section 1-09 <br /> MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-20 SANITARY SEWER FORCEMAINS I <br /> (******) <br /> 7-20.1 Description <br /> This Work consists of constructing sanitary sewer forcemains to lines and grades in accordance with <br /> the Plans, the Standard Specifications, COE Standard Drawings and these Special Provisions. <br /> 7-20.1 Description <br /> Supplement 7-20.1 as follows: <br /> 7-20.1(1) Submittals <br /> (******) <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> Provide Type 3E Working Drawings for temporary by-pass pumping. <br /> 7-20.2 Materials I <br /> Provide materials meeting the requirements of the following: <br /> Combination Air Release/Air Vacuum Valves 9-30.3(7) Special Provisions <br /> Provide the following pipe for sanitary sewer forcemains: <br /> Rigid Thermoplastic <br /> Ductile Iron HDPE (High Density Polyethylene) <br /> PVC (Polyvinyl Chloride) <br /> 7-20.3 Construction Requirements <br /> 7-20.3(1) Excavation and Preparation of Trench <br /> Prepare trench for sanitary sewer forcemain installation in accordance with 7-08.3(1), 7-09.3(4), <br /> 7-09.3(5), 7-09.3(6), 7-09.3(7) and 7-09.3(8) of the Standard Specifications and these Special <br /> Provisions. <br /> 7-20.3(1)A Trench Dewatering <br /> Dewater trench as necessary to install sanitary sewer forcemain in accordance with 7- <br /> 08.3(1)D of these Special Provisions. <br /> 7-20.3(2) Laying Pipe <br /> 7-20.3(2)A Survey Line and Grade <br /> Provide survey line and grade for sanitary sewer forcemain in accordance with 7-08.3(2)A of <br /> the Standard Specifications and these Special Provisions. <br /> 7-20.3(2)B Bedding the Pipe <br /> Provide pipe bedding for sanitary sewer forcemain accordance with 7-09.3(9)of the Standard ' <br /> Specifications and these Special Provisions. <br /> 7-20.3(2)C Pipe Laying - General <br /> Lay pipe in general for sanitary sewer forcemain in accordance with 7-08.3(2)B of the <br /> Standard Specifications and these Special Provisions. <br /> SEI to SRI Intertie,SRO8 Rehab Division 7—STORM,SEWER WO No.—UP3714 <br /> SP-148 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.