Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> ' 7-20.3(2)D Pipe Laying— HDPE <br /> Provide HDPE leak proof, thermal, butt joints, except at field closures and other joint <br /> connections specifically identified or approved by the Engineer, and butt weld in accordance <br /> with manufacturer's recommendation and ASTM D 2657. Use tools recommended by the <br /> pipe supplier and approved by the Engineer for joint fusing. Provide manufacturer trained <br /> and certified operators for the joint fusing equipment. Provide a fusing machine having <br /> hydraulic pressure control for fusing two pipe ends together. Accurately trim the ends of pipe <br /> to form perpendicular faces prior to fusing. Provide on the fusing machine an electrically <br /> heated and thermostatically controlled heating plate containing a temperature gauge for <br /> monitoring temperature. Periodically inspect the heating plate, using a temperature stick, to <br /> assure even heating. For connections requiring flanged connections, provide a HDPE flange <br /> adapter with a 316 stainless steel follower ring with Class 125 flange bolt pattern. <br /> Provide joints between pipe sections being even with pipe interior. Internal projection beads <br /> do not need be removed from each pipe joint. Provide a butt-fused joint having true <br /> alignment between the joined pipes with uniform roll back beads resulting from the use of <br /> 1 proper temperature and pressure. Allow the joint adequate cooling time before removing <br /> pressure. Provide watertight fused joint having tensile strength equal to that of the pipe. <br /> Provide City with opportunity to inspection and accept each joint. Cut-out and replace <br /> ' defective joints at no cost to the City. <br /> City will not allow or permit the following: <br /> • Threaded or solvent—cement joints and connections. <br /> • Fabrication of fittings in the field. <br /> • Sleeve couplings, repair bands, mechanical joints, flanges and other types of pipe <br /> connections are not permitted unless shown on the Plans or authorized in <br /> ' advance by the Engineer or Inspector. <br /> Provide trench construction in accordance with 7-08.3(1)A. Place pipe in the trench in <br /> accordance with 7-08.3(2)B and this section. Backfill in accordance with 7-08.3(3)and these <br /> ' Special Provisions. Backfill and compact when HDPE pipe is at the same temperature as <br /> the surrounding soil. If using flowable CDF for bedding or backfill, fill the pipe with water and <br /> anchor pipe to counteract buoyancy. City will not allow blocking under the pipe. <br /> Provide continuous HDPE pipe entering manholes. City will not allow short PVC closure <br /> segments, except where explicitly shown on the Plans or approved by the Engineer. Provide <br /> Kor-N-Seal Boots, or equal, to seal between the pipe and manhole wall. <br /> ' 7-20.3(2)E Rubber Gasket Joints <br /> Lay sanitary sewer forcemain pipe having rubber gaskets in accordance with 7-08.3(2)E of <br /> the Standard Specifications and these Special Provisions. <br /> 7-20.3(2)F Plugs <br /> Provide plugs for pipe branches, stubs or open pipe ends in accordance with 7-08.3(2)F of <br /> the Standard Specifications and these Special Provisions. <br /> 7-20.3(2)G Jointing of Dissimilar Pipe <br /> Join dissimilar pipes in accordance with 7-08.3(2)G of the Standard Specifications and these <br /> Special Provisions. <br /> 7-20.3(3) Backfilling <br /> Place backfill material in accordance with 7-08.3(3), 7-09.3(10) and 7-09.3(11) of the Standard <br /> Specifications and these Special Provisions. <br /> 7-20.3(4) Handling of Pipe <br /> Handle pipe in accordance with 7-09.3(13) of the Standard Specifications and these Special <br /> Provisions. <br /> SEI to SRI Intertie,SRO8 Rehab Division 7-STORM, SEWER SP-149 WO No.-UP3714 <br /> I <br />