Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I8-14.3(4) Curing <br /> Maintain sufficient protective covering on-site, such as waterproof paper or plastic membrane, to <br /> I cover an entire day's pour in event of rain or other unsuitable weather. <br /> Protect the concrete sidewalk against damage or defacement until Owner has been accepted the <br /> Work. Remove and replace sidewalk that is not acceptable to the Engineer because of damage <br /> I or defacement at Contractor's expense. <br /> After finishing, spray cement concrete sidewalk using transparent curing compound in <br /> accordance with 5-05.3(13)A of the Standard Specifications. <br /> I8-14.4 Measurement <br /> Delete all paragraphs in 8-14.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as described <br /> Iin Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT AND PAYMENT of the <br /> Standard Specifications. <br /> I 8-14.5 Payment <br /> Delete all paragraphs in 8-14.5 and substitute the following: <br /> Payment for Bid items of Work completed pursuant to the Contract Documents will be as <br /> I described in Division B - Bid Item Descriptions and Section 1-09 MEASUREMENT AND <br /> PAYMENT of the Standard Specifications. <br /> I <br /> 8-31 LINING <br /> 8-31.1 Description <br /> I This Work consists of installation of the liner pipe (HDPE) into the existing concrete outfall pipe. When <br /> complete, the liner pipe will extend from the existing SR08 control structure, to the existing outfall in a <br /> continuous, watertight length. <br /> I 8-31.2 Materials <br /> Provide materials meeting the following requirements: <br /> HDPE Pipe 9-05.23 Special Provisions <br /> I 8-31.3 Construction Requirements <br /> 8-31.3(1) Contractor Submittals <br /> Submit all material descriptions, procedures and experience requiring the Engineer's approval <br /> I prior to mobilizing or commencing sliplining activities at the Site. <br /> 8-31.3(1)A Qualifications <br /> Furnish a list of completed projects with name, date, and location of each project, name and <br /> I contact information of owner, and a brief description of work performed. <br /> 8-31.3(1)B Material I Shop Drawing Submittals <br /> Material and Shop Drawings shall include the following components: <br /> Ia. Product data for liner pipe, fittings, and other specified materials. <br /> b. Maximum joint deflection and bending radius. <br /> c. Drawings of specific connection details. <br /> d. Spacers/ Skids materials. <br /> e. Grout mix design and performance data including, but not limited to: <br /> 1) Flow characteristics. <br /> I 2) Viscosity. <br /> 3) Set time. <br /> 4) Proposed densities. <br /> I SEI to SRI Intertie,SRO8 Rehab Division 8-MISC CONSTRUCTION WO No.-UP3714 <br /> SP-160 <br />