My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION P - PROPOSAL <br /> CITY OF EVERETT, WASHINGTON <br /> SEI TO SRI INTERTIE AND SRO8 REHABILITATION PROJECT <br /> WORK ORDER# UP3714 <br /> 1 To the City Council <br /> Everett, Washington <br /> ' The undersigned Bidder declares that he has carefullyexamined the Plans and Specifications, Notice <br /> g <br /> to Contractors, Standard Specifications, Special Provisions, Appendix, Proposal, and Contract for the <br /> construction of approximately and other such Work as may be necessary, in accordance with the <br /> Specifications, as shown on the Plans. The undersigned declares that he has made such investigations <br /> as are necessary to determine the conditions to be encountered, and that, if this Proposal is accepted, <br /> ' he will enter into a contract with the City of Everett, Washington, in the form of Contract hereto annexed, <br /> he will, to the extent required, provide the necessary equipment, tools, apparatus, and other means of <br /> construction, and he will furnish all labor and materials necessary to complete the Work in the manner <br /> herein specified and according to the requirements of the Engineer. <br /> The undersigned Bidder certifies that this Proposal is in all respects fair and is made without collusion <br /> on the part of any person, firm or corporation mentioned below, and no officer or employee of the City <br /> of Everett is personally or financially interested, directly or indirectly, in the Proposal or in any purchase <br /> of or sale of any materials or supplies for the Work to which it relates, or any portion of the profits thereof. <br /> The undersigned Bidder agrees that he will complete the Work in all respects as required by Division <br /> C, Article 2. Time for Completion and that he will pay liquidated damages to the City in the amount <br /> specified in the Contract. <br /> Accompanying this Proposal is a bid bond or certified check in the amount of five percent (5%) of the <br /> Proposal according to the conditions of the "Notice to Contractors" and "Division 1 - General <br /> Requirements" hereby attached. If this Proposal shall be accepted by the City of Everett, Washington, <br /> and the undersigned shall fail to execute a satisfactory contract and bond, as stated in the Division 1 — <br /> 1111 General Requirements hereto attached, within 14 calendar days after the Award Date, then the City <br /> may, at its option, determine that the undersigned has abandoned the Contract and thereupon this <br /> Contract shall be null and void and the amount of the bid bond or certified check accompanying this <br /> Proposal shall be forfeited and become the property of the City of Everett, Washington. <br /> 1 <br /> 111 SEI to SRI Intertie, SRO8 Rehab Division P—PROPOSAL WO No.—UP3714 <br /> SP—19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.