Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Bid Item 17: Slipline Rehabilitation SRO8 Outfall Pipe <br /> Measurement and Payment: Lump Sum (LS) <br /> The Lump Sum price for this work shall be full compensation for all labor, material, tools and <br /> equipment necessary to satisfactorily complete the work as defined in these Contract Documents <br /> and includes, but is not limited to: <br /> Cleaning and preparing existing concrete outfall pipe. Furnishing and assembling HDPE lining <br /> string. Floating and installing HDPE liner. Sealing annual space between HDPE lining and host <br /> pipe. Grouting annual space between existing pipe and HDPE liner. And finishing connection at <br /> access manhole and at each end of the liner. <br /> Measurement will be based on the percentage of the work defined in this bid item that is completed <br /> at the time of measurement. <br /> I <br /> I <br /> I <br /> I <br /> SEI to SRI Intertie,SRO8 Rehab Division B—BID ITEM DESCRIPTIONS WO No.—UP3714 <br /> SP-18 <br />