My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Bid Item 17: Slipline Rehabilitation SRO8 Outfall Pipe <br /> Measurement and Payment: Lump Sum (LS) <br /> The Lump Sum price for this work shall be full compensation for all labor, material, tools and <br /> equipment necessary to satisfactorily complete the work as defined in these Contract Documents <br /> and includes, but is not limited to: <br /> Cleaning and preparing existing concrete outfall pipe. Furnishing and assembling HDPE lining <br /> string. Floating and installing HDPE liner. Sealing annual space between HDPE lining and host <br /> pipe. Grouting annual space between existing pipe and HDPE liner. And finishing connection at <br /> access manhole and at each end of the liner. <br /> Measurement will be based on the percentage of the work defined in this bid item that is completed <br /> at the time of measurement. <br /> I <br /> I <br /> I <br /> I <br /> SEI to SRI Intertie,SRO8 Rehab Division B—BID ITEM DESCRIPTIONS WO No.—UP3714 <br /> SP-18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.