My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ICITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 1 — GENERAL REQUIREMENTS <br /> ISupplement Division 1 by adding the following: <br /> I General Description and Location of Project <br /> (******) <br /> Work being performed includes furnishing all labor, materials and equipment necessary to construct <br /> I approximately 120 linear feet of 30" diameter ductile iron sanitary sewer pipe including fittings and <br /> valves, construction of a new saddle manhole on an existing 60" diameter sewer pipe, installing <br /> approximately 260 linear feet of 48" diameter HDPE pipe by slip-line methods, and other such <br /> appurtenances and performing all Work as required by the Contract, in accordance with the Contract <br /> 1 Plans and Contract Provisions. <br /> The Project is in Everett, Washington, and is generally located on 36th Street at Eclipse Mill Road and <br /> adjacent to the Snohomish River. <br /> IDesign Engineer <br /> (******) <br /> I Questions and inquiries about these Contract Documents should be directed in writing to the attention <br /> of Dave Voigt, P.E., City Project Manager, dvoigt@everettwa.gov. <br /> Standard Specifications <br /> I (******) <br /> All Work under this Contract shall be performed in accordance with the following Specifications except <br /> as may be exempted or modified by other sections of these Contract Documents. These <br /> I Specifications are incorporated by reference, made a part of this Contract and shall control and guide <br /> all activities within this Project whether referred to directly, paragraph by paragraph. <br /> WSDOT/APWA"2020 Standard Specifications for Road, Bridge and Municipal Construction", as <br /> I amended, hereinafter referred to as the "Standard Specifications." <br /> The Standard Specifications, as modified or supplemented by the Amendments to the Standard <br /> Specifications and these Special Provisions, all of which are made a part of the Contract Documents, <br /> shall govern all of the Work. The following latest edition of other specifications and standard plans <br /> I <br /> shall apply to the extent to which they are called out in these Plans and Special Provisions. <br /> (i) 1. City of Everett "Design and Construction Standards and Specifications", latest <br /> edition as found on the Web at"http://everettwa.gov/DocumentCenterNiew/243". <br /> I <br /> (j) 2. WSDOT Amendments to the Standard Specifications as found on the Web at <br /> "http://www.wsdot.wa.gov/Business/Construction/SpecificationsAmendmentsGSPs.htm". <br /> (k) 3. "Standard Plans for Road and Bridge Construction", as prepared by WSDOT. <br /> I (I) 4. "Manual on Uniform Traffic Control Devices (MUTCD)." <br /> (m)5. APWA Standards. <br /> (n) 6. AWWA Standards. <br /> I Each Provision of these Special Provisions either supplements, modifies, or replaces the comparable <br /> Standard Specification, or is a new Provision. The deletion, amendment, alteration, or addition to any <br /> subsection or portion of the Standard Specifications is meant to pertain only to that particular portion <br /> I of the section, and in no way should it be interpreted that the balance of the section does not apply. <br /> Sections and subsections in the Special Provisions labeled under the headers with (******) indicate <br /> City of Everett Provisions. <br /> I 1-01 DEFINITIONS AND TERMS <br /> 1-01.3 Definitions <br /> Delete the three paragraphs under the heading Completion Dates, and substitute the following: <br /> I SEI to SRI Intertie,SRO8 Rehab Division 1 -GENERAL REQUIREMENTS WO No.-UP3714 <br /> SP-39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.