My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Allied Construction Associates Inc. 4/23/2021
>
Contracts
>
Capital Contract
>
Allied Construction Associates Inc. 4/23/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/9/2023 3:09:14 PM
Creation date
4/30/2021 10:40:33 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Allied Construction Associates Inc.
Approval Date
4/23/2021
Council Approval Date
3/31/2021
Department
Public Works
Department Project Manager
Dave Voigt
Subject / Project Title
SEI to SRI Intertie and SRO8 Rehabilitation
Public Works WO Number
UP3714
Tracking Number
0002874
Total Compensation
$994,985.50
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Allied Construction Associates Inc. 4/12/2023 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
Allied Construction Associates Inc. 5/4/2023 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
299
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Substantial Completion Date: The day the Engineer determines the City has full and <br /> unrestricted use and benefit of the facilities, both from the operational and safety standpoint, any <br /> remaining traffic disruptions will be rare and brief, and only minor incidental work, replacement of <br /> temporary substitute facilities, plant establishment periods, or correction or repair remains for the <br /> Physical Completion of the total Contract. <br /> Physical Completion Date: The day all of the Work is physically completed on the project. All111 <br /> documentation required by the Contract and required by law does not necessarily need to be <br /> furnished by the Contractor by this date. <br /> Completion Date: Date on which Project is ready for Final Acceptance. All physical work, <br /> including Punch List, is complete and Contractor has completed and fulfilled all contractual <br /> obligations except any maintenance of landscaping. Contractual obligations that must be fulfilled <br /> prior to achievement of the Completion Date include and are not limited to; the Contractor's <br /> furnishing all documentation, including correct, complete and accurate as-built or record drawings <br /> and operation and maintenance manuals and transfer of warranties. (This definition replaces the <br /> definition in WSDOT 1-01.3 for Completion Dates.) <br /> Revise the following definitions to read as follows: <br /> Bid Documents: The component parts of the proposed Contract which may include, but are not <br /> limited to, the Proposal Form, the proposed Contract Provisions, the proposed Contract Plans, <br /> and Addenda. (This definition replaces the definition in WSDOT 1-01.3 for Bid Documents.) <br /> Contract: Written agreement signed between the Owner and Contractor and includes Division <br /> C — CONTRACT, Division P - PROPOSAL, Division B — BID ITEM DESCRIPTIONS, Special <br /> Provisions, Contract Plans, Standard Specifications and amendments, Standard Plans in effect <br /> as of the date Bids are opened, Addenda, supplemental agreements, change orders, <br /> certifications and affidavits required by this Contract and by law, and Federal requirements that <br /> apply to this Contract and Project. (This definition replaces the definition in WSDOT 1-01.3 for <br /> Contract.) <br /> Contract Bond(s): Include a separate performance bond and payment bond, as set forth in the <br /> Contract Documents. (This definition supplements the definition in WSDOT 1-01.3 for Contract <br /> Bond.) <br /> Engineer: The City's representative who administers the construction program for the City. <br /> Provisions in the Contract Documents that state the Engineer"shall" or"will" shall be deemed to <br /> mean that the Engineer shall or will take such action if requested in writing by the Contractor. <br /> (This definition replaces the definition in WSDOT 1-01.3 for Engineer.) <br /> Specifications: Includes 2020 WSDOT/APWA Standard Specifications and latest Amendments, ' <br /> and all other specifications (including these Special Provisions) for the prescribed Work in this <br /> Contract. (This definition replaces the definition in WSDOT 1-01.3 for Specifications.) <br /> Working Drawings: Drawings, shop drawings, plans, diagrams, or calculations, including a <br /> schedule of submittal dates for Working Drawings where specified, which the Contractor must <br /> submit to the Engineer. (This definition replaces the definition in WSDOT 1-01.3 for Working <br /> Drawings.) <br /> Supplement Section 1-01.3 by adding the following: <br /> All references in the Standard Specifications to the terms"State", "Department of Transportation", <br /> "Washington State Transportation Commission", "Commission", "Secretary of Transportation", <br /> "Secretary", "Headquarters", and "State Treasurer" shall be revised to read "City." <br /> All references to the terms "State" or "state" shall be revised to read "City" unless the reference <br /> is to an administrative agency of the State of Washington, a State statute or regulation, or the <br /> context reasonably indicates otherwise. <br /> All references to "State Materials Laboratory" shall be revised to read "City designated location." <br /> SEI to SRI Intertie,SRO8 Rehab Division 1 -GENERAL REQUIREMENTS WO No.-UP3714 <br /> SP-40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.