CITY OF EVERETT SPECIAL PROVISIONS <br /> an appropriate Change Order. After discovery by the Contractor of an error or omission, <br /> related Work performed by the Contractor shall be done at its risk unless authorized by <br /> the City's Representative and approved by the City. <br /> 1-04.1(3)C(2) Conflicting Provisions <br /> In the event an item of Work is described differently in two or more locations on the <br /> Plans, in the Specifications and Special Provisions, the Contractor shall, upon request <br /> of the City's Representative, submit in writing to the City's Representative the description <br /> upon which the Contractor relied in preparing its Bid or laying out the Work. <br /> 1-04.1(3)D Utilities <br /> 1-04.1(3)D(1) General <br /> The City has endeavored to determine the existence of public and private utilities at the <br /> site of the Work from the records of the owners of known utilities in the vicinity of the <br /> Work. The positions of these utilities as derived from such records are shown on the <br /> Plans. Unless otherwise noted, no excavations were made to verify the locations shown <br /> for underground utilities. The service connections to the gas, electric, cable TV and <br /> communication utilities are not shown on the Plans. Refer to 1-07.17 UTILITIES AND <br /> SIMILAR FACILITIES regarding Contractor's responsibility for locating and verifying <br /> underground public and private utilities. <br /> 1-04.1(3)D(2) Unknown/Incorrectly Marked Utilities <br /> When a utility interferes with the Work and is either (1) not identified on the Plans or (2) <br /> located in a position significantly different from that specified on the Plans or in <br /> accordance with a particular utility's standard depth and location, Contractor shall follow <br /> the procedures of 1-04.7 DIFFERING SITE CONDITIONS (CHANGED CONDITIONS). <br /> Interference with the Work is defined as a utility that crosses or projects into the plane <br /> of the Work at an elevation between the top and bottom of the Work. <br /> 1-04.2 Coordination of Contract Documents, Plans, Special Provisions <br /> Specifications, and Addenda <br /> Revise the second paragraph of 1-04.2 to read as follows: <br /> Any inconsistency in the parts of the Contract shall be resolved by following this order of <br /> precedence: <br /> 1. Change Orders, <br /> 2. Addenda, <br /> 3. Contract, <br /> 4. Proposal Form, <br /> 5. Special Provisions, <br /> 6. Contract Plans, I <br /> 7. City's Standard Drawings (if any) <br /> 8. WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal Construction, <br /> 9. Amendments to WSDOT Standard Specifications for Road, Bridge, and Municipal <br /> Construction, and <br /> 10.WSDOT/APWA Standard Plans for Road, Bridge and Municipal Construction. <br /> Revise the seventh paragraph of 1.04.2 to read as follows: <br /> In case of any ambiguity or dispute over interpreting the Contract, the Engineer's decision will be <br /> final as provided in 1-05.1 AUTHORITY OF THE ENGINEER. <br /> 1-04.3 Reference Information <br /> Revise 1-04.3 to read as follows: <br /> SEI to SRI Intertie,SRO8 Rehab Division 1 -GENERAL REQUIREMENTS WO No.-UP3714 <br /> SP-52 <br />