Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Reference Information provided to the Contractor is not part of the Contract. The City of Everett <br /> does not guarantee the accuracy of the Reference Information and is not responsible for the <br /> content of the Reference Information in any manner. Any use of Reference Information by the <br /> Contractor is done solely at the Contractor's risk. <br /> 1-04.4 Changes <br /> ' Delete 1-04.4 and substitute the following: <br /> 1-04.4 Changes <br /> 1-04.4(1) City's Right to Direct Changes to the Work <br /> The City reserves the right to change the Work at any time. Such changes shall not invalidate <br /> the Contract nor release the Surety, and the Contractor agrees to perform the Work as changed. <br /> Among others, these changes and alterations may include: <br /> 1. Deleting or omitting any part of the Work, Equipment or material to be provided under <br /> this Contract, <br /> i2. Increasing or decreasing quantities, <br /> 3. Altering Specifications, designs, or both, <br /> ' 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> 6. Altering facilities, Equipment, materials, services, or sites, provided by the City, and <br /> ' 7. Ordering the Contractor to accelerate or Delay the Work. <br /> If the Contractor and City do not agree upon scope of Work changed or adjustment to the Contract <br /> Sum and Contract Time, the City may, at its sole option, unilaterally direct the Contractor to <br /> implement City directed change by notice. The City shall not pay or be responsible or liable for <br /> changes implemented by the Contractor without explicit notice from the City to proceed. <br /> 1-04.4(2) Extra Work <br /> At its sole option, the City may (1) perform Extra Work itself, (2) employ others to do it, (3) direct <br /> the Contractor to perform the Extra Work at existing unit Bid price, (4) direct the Contractor to <br /> perform the Extra Work at a mutually agreed upon price, or (5) direct the Contractor to perform <br /> the Extra Work on a Force Account basis. <br /> 1-04.4(3) Change Orders <br /> (******) <br /> Changes to the Work may result in an increase or decrease in Contract Sum, as provided in 1- <br /> 09.4 Equitable Adjustment. Requests for an increase in Contract Time shall be made as provided <br /> in 1-08.3 PROGRESS SCHEDULE as applicable. Substantial changes in Contract Time, <br /> ' Contract Sum or Work will often be negotiated and agreed between the Contractor and City before <br /> the City directs the Contractor to proceed with the change. <br /> If the Contractor and City agree on the scope of Work and any changes to Contract Sum and <br /> Contract Time, the Contractor and City shall execute an agreed Change Order. However, if the <br /> Contractor and City do not agree, the City may, in its sole discretion, issue a unilateral Change <br /> Order in the form attached to the Contract Documents changing the scope of Work and making <br /> any adjustments to the Contract Sum pursuant to 1-09.4 EQUITABLE ADJUSTMENT and <br /> Contract Time pursuant to 1-08.8 EXTENSIONS OF TIME in such amount and for such time as <br /> the City believes appropriate. Contractor agrees to use the agreed Change Order form attached <br /> to the Contract Documents. The Contractor accepts all requirements, terms and conditions of a <br /> Change Order by: signing it; writing a separate acceptance; or by failing to notify the City <br /> ' SEI to SRI Intertie,SRO8 Rehab Division 1 -GENERAL REQUIREMENTS WO No.-UP3714 <br /> SP-53 <br /> I <br />