CITY OF EVERETT SPECIAL PROVISIONS <br /> expense. Costs for completing the survey work required by the Engineer will be deducted from ' <br /> monies due or to become due the Contractor. <br /> The City may spot-check the Contractor's surveying. These spot-checks will not change the <br /> requirements for normal checking and testing as described elsewhere, and do not relieve the <br /> Contractor of the responsibility of producing a finished product that is in accordance with the <br /> Contract. <br /> In all disputes concerning accuracy of lines and elevations, the City shall be assumed correct and <br /> the Contractor shall correct the discrepancies before construction work may proceed. No <br /> additional compensation will be paid for this corrective Work. <br /> Payment: The lump sum contract price for "Surveying" shall be full pay for all costs involved in <br /> furnishing all labor, tools, survey instruments, materials, and other equipment necessary for the <br /> setting and maintaining of the alignment and grade as specified. <br /> 1-05.6 Inspection of Work and Materials <br /> Supplement 1-05.6 by adding the following: <br /> 1-05.6(1) Demonstration of Compliance with Contract Requirements <br /> (******) <br /> The burden of proving the constructed Work complies with the Contract Documents shall be on <br /> the Contractor at all times. The Contractor shall grant the City's Representative access to the <br /> Work and work site and to places where Work is being prepared, or where materials, Equipment, <br /> or machinery are being obtained for the Work. The Contractor shall provide information requested <br /> by the City's Representative in connection with inspection work. <br /> If the Contract Documents, laws, ordinances, or public regulatory authority requires parts of the <br /> Work to be specially inspected, tested, or approved, the Contractor shall give the City's <br /> Representative be not less than two working days prior written Notice of the availability of the <br /> subject Work for examination. <br /> Inspection and quality control tests performed on the Contractor's work by the City's <br /> Representative shall not relieve the Contractor of its responsibility for errors or lack of quality <br /> therein and shall not be regarded as an assumption of risks or liability by the City's Representative <br /> for the Contractor's compliance with these Contract Documents. Contractor remains responsible <br /> and liable for all errors, defects or a lack of quality not discovered by inspection or observation. <br /> 1-05.6(2) Manufacturer's Directions <br /> (******) <br /> Manufactured articles, material and Equipment shall be transported, stored, applied, installed, <br /> connected, erected, adjusted, tested, operated and maintained as recommended by the <br /> manufacturer, unless otherwise specified in these Special Provisions. Contractor shall provide <br /> manufacturer's installation instructions and procedures to the City prior to installation of the <br /> manufactured articles, material and Equipment. <br /> 1-05.6(3) Materials and Equipment Furnished by City <br /> (******) <br /> Contractor shall install materials and Equipment furnished by the City as provided in the technical <br /> sections of the Specifications. Furnishing of material and Equipment by the City will be <br /> considered conclusive evidence of their acceptability for the purpose intended. If the Contractor <br /> discovers defects in material or Equipment furnished by the City, it shall immediately notify the <br /> City. After such discovery, the Contractor shall not proceed with Work involving City-furnished <br /> materials and Equipment unless authorized by the City. Unless otherwise noted or specifically <br /> stated, materials and Equipment furnished by the City, that are not of local occurrence or <br /> manufacture, are considered to be "FOB" railroad station or truck terminal nearest to the site of111 <br /> the Work. At no cost to the City, the Contractor shall unload, transport, store, and protect such <br /> material and Equipment from damage. The Contractor shall inspect such City-furnished material <br /> SEI to SRI Intertie,SRO8 Rehab Division 1 —GENERAL REQUIREMENTS WO No.—UP3714 <br /> SP—62 <br />