My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7011 MCDOUGALL AVE 2022-02-23
>
Address Records
>
MCDOUGALL AVE
>
7011
>
7011 MCDOUGALL AVE 2022-02-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 3:01:57 PM
Creation date
5/3/2021 2:37:33 PM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
7011
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 ! <br />B2006-26: Corrections 2 <br />*** I am only including drawings where I made modifications which include: Site Plan, <br />Basement Plan, First Floor Plan, Second Floor Plan and Front Door Elevation. In addition, I am <br />adding Construction Drawings A-D per your request. Kitchen elevations are not included as there <br />were no changes in this submission. Please refer to Kitchen elevations from the last <br />submission * * * <br />1. Addressed <br />2. Addressed <br />3. Addressed <br />4. Addressed <br />5. Addressed <br />6. Correction 1: We did have to replace the front shingles where there was rot <br />near the front entry. Upon further inspection, this was isolated to the shingles <br />themselves. The only framing repair we did was around the front window like <br />and kind. We redesigned the front entry way, but this is purely cosmetic and <br />has nothing do with repairing framing. I included an elevation so you can get <br />an idea. Correction 2: There were NO shear walls. As I've mentioned, the <br />calculations on the original are irrelevant and should be discarded. This is why <br />I redid the entire drawings during Corrections 1 to reflect the scope of the <br />work. In addition to the shingle and casement repairs above, the ONLY thing <br />that is being modified are the columns on the front design. The existing <br />decorative columns are round. We replaced with decorative square columns (I <br />updated the drawing to note this. Nothing structural -all cosmetic. <br />7. Addressed <br />8. Correction 1 Regarding 2x4's and load bearing. We have not subtracts any <br />of the existing framing. WCG reinforced some of it, but nothing had affected <br />#hA 1^aA 6 ^---A^^n -moned. Pri r +^ my :%r%n •mil 1.AJCG did add framing alongside <br />the exterior walls (concrete) and added foam insulation. The ceilings are 92" <br />and all spaces are compliant with IRC R106.1.1, R304, R305. Carr§ <br />2: See Construction Drawing A <br />9. Addressed <br />10.Addressed <br />11.Addressed <br />12. Correction 1: You're assumption here is partially correct. We plan to add <br />guardrails between the stairs. Otherwise, both are surrounded by <br />walls. Correction 2: I have added a 2nd note on the site plan regarding <br />guardrails. In addition, pleas see C #r...+:,R. D-- -M , -P TK pk.RIA K^ <br />adequate to address this. <br />13. Addressed <br />14.Correction 1: This is regarding. i.^.c�l�+�.,•,^+,..A r+ t.;,�r f.,� w, ± <br />navigate. The R-5 he is referring to is a foam insulation against slab concrete. <br />Th-3f is ►� nht rosy. verg i have hired a Hcensed, bonded insulation <br />specialist who is waiting to complete this. Perhaps this could be addressed <br />
The URL can be used to link to this page
Your browser does not support the video tag.