My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7011 MCDOUGALL AVE 2022-02-23
>
Address Records
>
MCDOUGALL AVE
>
7011
>
7011 MCDOUGALL AVE 2022-02-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2022 3:01:57 PM
Creation date
5/3/2021 2:37:33 PM
Metadata
Fields
Template:
Address Document
Street Name
MCDOUGALL AVE
Street Number
7011
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />during a pre -con meeting or during his permit process? Correction 2: See <br />Construction Drawing A <br />15. Correction 1: The garage is returning to its previous permitted use. Wall <br />separation between residence and garage will comply to IRC R302.6 with at <br />least 1/2" gypsum between. Garage ceiling is not being altered. Correction 2: 1 <br />added a note to adequately address this on the ceiling. <br />16.Addressed <br />17. Add ressed <br />18. Correction 1: Locations will be compliant with IRC R314.3, R315.3 and is <br />indicated in the general notes. Correction 2: Locations have been added on <br />he First Floor plan. <br />19. Correction 1: This is being managed by Atmospheric Heating who has <br />submitted a permit request. I'm 100% sure they will be up to code. Can we <br />discuss this with them during the rough -in inspections? Correction 2: We are <br />using mini -splits and their locations are shown already on the drawings. There <br />is no ducting/exhaust except where kitchen range hood is located. I have <br />updated the. location on the first floor and 2"d floor plans. <br />20. NEW Correction 1: Provided new and updated drawings <br />a. A guardrail system. The proposed elevation of the deck is 5'-6" (assuming <br />this is the final elevation from finished grade). Please provide construction <br />details for a guardrail system to be installed that includes addressing the <br />construction of the guardrail connections to the floor framing system. IRC <br />R312 and applicable subsections. See Construction Drawing C <br />b. Details addressing lateral connections per WA State amended IRC <br />R507.2.4. Please provide construction details for these connections. See <br />Construction Drawing C <br />c. Locations on the plan showing where each footing/pier block for the deck <br />posts is to be constructed as well as size of footings. IRC R106.1.1. Added <br />in Site Plan <br />d. Beam sizes where the proposed joists are spanning to between the existing <br />house the end of the deck. IRC R106.1.1, WA State Interpretation 16-11. <br />Added to notes on Site Plan. <br />e. Joist sizes proposed to be shown spanning between the existing house and <br />the beams (see item d.). IRC R106.1.1, WA State Interpretation 16-11. <br />Added to notes on Site Plan. <br />- <br />f. A landing at the bottom of the stairway as the existing concrete pathway <br />does not appear to meet the bottom of the stairway. It appears to be in close <br />proximity, but is not at the bottom of the stairway as required. IRC R311.7.6. <br />This was a mistake on the drawing. Concrete goes all the way up and <br />underneath the stair landing. See updated Site plan <br />g. Hardware callouts and details showing the connections of the posts to <br />beams, posts to foundations, posts to joists, beams to joists, joists to ledger. <br />IRC R106.1.1. See Construction Drawing D <br />h. The species of wood for the replacement deck. IRC R106.1.1. Called out on <br />Site Plan <br />213 <br />
The URL can be used to link to this page
Your browser does not support the video tag.