My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2801 OAKES AVE 2022-02-24
>
Address Records
>
OAKES AVE
>
2801
>
2801 OAKES AVE 2022-02-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2022 11:18:00 AM
Creation date
5/3/2021 3:36:28 PM
Metadata
Fields
Template:
Address Document
Street Name
OAKES AVE
Street Number
2801
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />MI I Botesch, Nash & Hall <br />Architects, P.S. <br />April 6, 2020 <br />City of Everett <br />3200 Cedar Street <br />Everett, WA 98201 <br />Attn: Mr. Drew Martin <br />Re: Owner: City of Everett <br />Job Address: 2801 Oakes Avenue <br />Plan Check Number: B2001-004, First Building Review <br />Dear Drew, <br />D ME 6C)ME 9 V/ <br />APR 0 9 2020 <br />CITY OF EVERETT <br />Permit ServiCes <br />This letter is our formal response to your building plan review comments dated January 31, 2020. <br />Architectural <br />General: <br />1. The proposed project should comply with the requirements of the 2015 International Existing Building <br />Code. The code should be specified in the Project Data on Sheet G1.0. See the Everett Municipal <br />Code Section 16.005.030 Article A, IBC Sections 101.4.7 and 107.2.1, and IEBC 106.2.1. <br />See revised Project Data Sheet G1.0. <br />2. Work on existing buildings should comply with the IEBC. The IEBC provides three alternative <br />methods for performing work: the Prescriptive Compliance Method (Section 301.1.1), the Work Area <br />Method (301.1.2), and the Performance Compliance Method (301.1.3). The method selected for the <br />project should be specified in the Project Data on Sheet G1.0. A statement should be provided <br />clarifying the types of work that are included in the project (e.g., repairs, additions, change of <br />occupancy, etc.) and referencing the appropriate IEBC sections. The comments provided herein <br />presume the project will comply with the Work Area Method of Chapter 5. Based on a review of the <br />construction drawings, the proposed project appears to include the following work: Level 2 <br />Alternations (Chapter 8). Additional and alternative types of work required for the project shall be <br />identified by the designer -of -record. Additional comments may be pending. See IBC Section 101.4.7 <br />and IEBC Section 301.1. <br />See added statement in Project Data on Cover Sheet G1.0. <br />1/4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.