Laserfiche WebLink
TABLE OF CONTENTS <br />Section Page <br />1.0 GENERAL.................................................................................................................1 <br />2.0 SITE AND PROJECT DESCRIPTION.....................................................................1 <br />3.0 SUBSURFACE EXPLORATIONS...........................................................................3 <br />3.1 SITE GEOLOGY................................................................................................3 <br />3.2 SUBSURFACE EXPLORATION...........................................................................3 <br />3.3 SOIL CONDITIONS............................................................................................3 <br />3.4 GROUNDWATER..............................................................................................4 <br />4.0 GEOTECHNICAL RECOMMENDATIONS...........................................................5 <br />4.1 SEISMIC DESIGN PARAMETERS........................................................................5 <br />4.2 BUILDING FOUNDATIONS................................................................................6 <br />4.2.1 Lateral Resistance...........................................................................6 <br />4.2.2 Perimeter Footing Drains...............................................................7 <br />4.2.3 Footing Subgrade Preparation.......................................................7 <br />4.3 FLOORS SLABS................................................................................................7 <br />4.4 RETAINING AND BASEMENT WALL DESIGN PARAMETERS ..............................8 <br />4.4.1 Lateral Earth Pressures..................................................................8 <br />4.4.2 Surcharge........................................................................................8 <br />4.4.3 Lateral Resistance...........................................................................9 <br />4.4.4 Wall Drainage.................................................................................9 <br />4.4.5 Wall Backfill....................................................................................9 <br />4.5 PERMANENT CUT AND FILL SLOPES................................................................10 <br />5.0 EARTHWORK CONSIDERATIONS.......................................................................10 <br />5.1 TEMPORARY EXCAVATIONS AND SHORING.....................................................10 <br />5. L I Ultrablock Shoring..........................................................................11 <br />5.1.2 Cantilevered Soldier Piles with Timber Lagging Shoring..............12 <br />5.2 MATERIAL REUSE...........................................................................................13 <br />5.3 STRUCTURAL FILL AND COMPACTION.............................................................13 <br />5.4 WET WEATHER CONSTRUCTION.....................................................................13 <br />5.5 EROSION CONSIDERATIONS.............................................................................14 <br />6.0 ADDITIONAL SERVICES.......................................................................................15 <br />7.0 CLOSURE.................................................................................................................15 <br />8.0 REFERENCES...........................................................................................................17 <br />ATTACHMENTS: <br />Figure 1 Vicinity Map <br />Figure 2 Site and Exploration Plan <br />Figure 3 Design Lateral Earth Pressures: Cantilevered Soldier Pile Shoring <br />Appendix A Boring Logs <br />Figure A-1 Terms and Symbols for Boring and Test Pit Logs <br />Figures A-2 to A-4 Logs of Test Borings PG-1, PG-2 and PG-3 <br />17-233 1020 North Broadway Page 1 PanGEO, Inc. <br />