My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1020 N BROADWAY EVCC STUDENT HOUSING - WHOLE SITE 2022-05-23
>
Address Records
>
N BROADWAY
>
1020
>
EVCC STUDENT HOUSING - WHOLE SITE
>
1020 N BROADWAY EVCC STUDENT HOUSING - WHOLE SITE 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 7:19:22 AM
Creation date
5/3/2021 3:42:11 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1020
Tenant Name
EVCC STUDENT HOUSING - WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A <br />FbnGHO <br />I R C O R P O R A T! O <br />Geotechnical & Earthquake <br />Engineering Consultants <br />July 5, 2018 <br />PanGEO Project No. 17-233 <br />Mr. Jason Anderson <br />koz Development <br />1208 Tenth Street, Suite 201 <br />Snohomish, Washington 98290 <br />Subject: Temporary Shoring Recommendations <br />Proposed Apartments: 1020 North Broadway, Everett, Washington <br />Dear Mr. Anderson: <br />As requested, PanGEO, Inc., is pleased to present this letter providing temporary shoring <br />recommendations for the proposed apartments at 1020 North Broadway in Everett, <br />Washington. We previously prepared a geotechnical report for this project dated October <br />29, 2017. <br />PROJECT BACKGROUND <br />It is planned to develop the site with a 140-unit apartment building. The proposed <br />apartment building will include one level of below grade parking. <br />The below grade parking level will have a construction subgrade elevation of about 107 <br />feet. Existing grades around the triangular -shaped site slope down from the south to the <br />north and east with surface elevations ranging from elevation 108 to 121 feet. <br />The building excavation will extend up to the property boundaries as a zero -lot line <br />excavation. <br />It is planned to use control density fill (CDF) to form a temporary shoring wall to support <br />the sides of the excavation during construction. Based on the results of the test borings <br />completed at the site, -the site is underlain by 2 '/2 to 5 feet of fill overlying Vashon till <br />comprised of medium dense to very dense silty sand with gravel. As such, it is our opinion <br />that a gravity wall constructed of CDF is appropriate. <br />3213 Eastlake .avenue, East, Suite B <br />Seattle, WA 98102 <br />�1e <br />! <br />-r. (206) 262-0370 <br />F. (206) 262-0374 <br />2018 <br />a 1.FY F <br />Perrnit Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.