Laserfiche WebLink
Temporary Shoring Recommendations <br />Proposed Apartments: 1020 North Broadway, Everett, Washington <br />July 5, 2018 <br />wall. The results of the shoring monitoring should be transmitted to PanGEO for our <br />review. The shoring monitoring may end after the permanent walls are cast against the <br />shoring wall. <br />The permanent basement walls can be cast directly against the CDF shoring. In order to <br />maintain drainage, a continuous layer of a geocomposite drainage mat, such as Miradrain <br />6000 or an approved equivalent should be installed between the CDF shoring and <br />permanent wall. The collected water should be directed to a 4-inch diameter tightline <br />collection pipe along the inside perimeter of wall footing and should then be discharged to <br />an appropriate outlet. <br />We trust this information meets your current needs. Please contact us if you have any <br />questions. <br />Sincerely, <br />PanGEO, Inc. <br />e C{ Wash <br />ah 1.A/V r <br />sro y� 0r, W A; tii9Z' <br />7 <br />0 <br />Engineering Geobgist � 303 <br />�fyQ 2- j if <br />oe4 212 <br />15 <br />Sed Geo ONAL <br />Scott D. Dinkelman <br />Scott D. Dinkelman, LEG <br />Senior Engineering Geologist <br />17-233 1020 N Broadxvav - CDF Shorina47 ?3:34020-N44oAwayPage <br />PanGEO, Inc. <br />Siew L. Tan, P.E. <br />Principal Geotechnical Engineer <br />