My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1020 N BROADWAY EVCC STUDENT HOUSING - WHOLE SITE 2022-05-23
>
Address Records
>
N BROADWAY
>
1020
>
EVCC STUDENT HOUSING - WHOLE SITE
>
1020 N BROADWAY EVCC STUDENT HOUSING - WHOLE SITE 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 7:19:22 AM
Creation date
5/3/2021 3:42:11 PM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1020
Tenant Name
EVCC STUDENT HOUSING - WHOLE SITE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
301
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• City's Staff Report, dated August 13, 2018 (Exhibit C-21) <br />• Appellant's [Pre -Hearing] Reply to City and Applicant Responses, and Supplemental <br />Designation of Exhibits, dated August 17, 2018 (Exhibit C-37) <br />• Appellant's Post -Hearing Brief, dated September 4, 2018 <br />• City's Post -Hearing Brief, dated September 12, 2018 <br />• Appellant's Post -Hearing Reply, dated September 17, 20183 <br />Orders <br />• Order Setting Pre -Hearing Schedule, issued July 12, 2018 <br />• Post -Hearing Submission Schedule, issued August 24, 2018 <br />Upon consideration of the argument, testimony, and exhibits submitted, the Hearing Examiner <br />enters the following findings and conclusions. <br />FINDINGS <br />Decisions Appealed From <br />1. Koz Development (Koz, Applicant) proposed the construction of a 140-unit apartment <br />building intended to house primarily students attending Everett Community College <br />(ECC) and Washington State University. The site of the proposed development is <br />addressed as 1020 N. Broadway and is located within the Broadway Mixed Use (BMU) - <br />Institutional Overlay zone established as part of the Everett Community College Master <br />Plan adopted by Ordinance No. 2849-05 and modified through Ordinance No. 3098-08. <br />Exhibits A-2, A-3, C-11, and C-12. <br />2. In review of the proposed housing project, the City issued four administrative <br />determinations made by the Director of the City's Planning and Community Development <br />Department (Director, Department) on June 5, 2018, including (briefly paraphrased): <br />• Final Mitigated Determination of Non -Significance (SEPA 17-013), which <br />concluded that mitigated as required the proposal would not result in probable, <br />significant, adverse environmental impacts (Exhibit C-1); <br />• Planning Director Decision/Modification of BMU Design Standards (REVII #17- <br />016), which approved modifications of design standards relating to curb cuts, roof <br />forms, ground level transparency, weather protection, and ground level detail <br />standards (Exhibit C-2); <br />3 There was an email attached to the Appellant's post -hearing reply. For some reason, it was not legible (all text was <br />blocked out); however, additional exhibits were prohibited in the post -hearing order and it would not have been <br />considered or admitted had it been legible. <br />Findings, Conclusions, and Decisions in the Everett Comm. College Appeals of <br />Koz Student Housing Administrative Decisions REV II # 17-016, PDI # 15-02, PDI # 18-02, and SEPA # 17-013 <br />Everett Hearing Examiner page 7 of 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.