Laserfiche WebLink
Table 1-2.5.1 On-Site Stormwater Management Requirements for <br /> Projects Triggering Minimum Requirements #1 - #9 <br /> P ,'ect Type and Location Requirement <br /> New develop -nt on any parcel inside Low Impact Development Performance <br /> the UGA, or new .-velopment outside the Standard and BMP T5.13: Post-Construction <br /> UGA on a parcel les than 5 acres Soil Quality and Depth (p.911); or List#2 <br /> (applicant option). <br /> New development outside e UGA on a Low Impact Development Performance <br /> parcel of 5 acres or larger Standard and BMP T5.13: Post-Construction <br /> • Soil Quality and Depth (p.911). <br /> Redevelopment on any parcel insid- the Low Impact Development Performance <br /> UGA, or redevelopment outside the U Standard and BMP T5.13: Post-Construction <br /> Soil Quality and Depth (p.911); or List#2 <br /> on a parcel less than 5 acres •plicant option). <br /> Redevelopment outside the UGA on a par-Lo mpact Development Performance <br /> cel of 5 acres or larger Standa • and BMP T5.13: Post-Construction <br /> Soil Quail • and Depth (p.911). <br /> Note: This table refers to the Urban Growth Area (UGA) . designated under the <br /> Growth Management Act(GMA) (Chapter 36.70A RCVV) of e State of Washington. If <br /> the Permittee is located in a county that is not subject to planni • under the GMA, the <br /> city limits shall be used. <br /> Low Impact Development Performance Standard <br /> Stormwater discharges shall match developed discharge durations to • e- <br /> developed durations for the range of pre-developed discharge rates from °° of <br /> the 2-year peak flow to 50% of the 2-year peak flow. Refer to the Standard Flo <br /> Control Requirement section in Minimum Requirement#7 for information about <br /> the assignment of the pre-developed condition. Project sites that must also meet <br /> minimum requirement#7—flow control -must match flow durations between 8% of <br /> the 2-year flow through the full 50-year flow. <br /> List#1: On-site Stormwater Management BMPs for Projects Triggering <br /> Minimum Requirements #1 through #5 <br /> For each surface, consider the BMP's in the order listed for that type of surface. <br /> Use the first BMP that is considered feasible. No other On-site Stormwater Man- <br /> agement BMP is necessary for that surface. Feasibility shall be determined by eval- <br /> uation against: <br /> 1. Design criteria, limitations, and infeasibility criteria identified for each BMP in <br /> this manual; and <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume I- Chapter 2-Page 56 <br />