Laserfiche WebLink
2. Competing Needs Criteria listed in Chapter V-5 -On-Site Stormwater Man- <br /> agement(p.903). <br /> Lawn and landscaped areas: <br /> Post-Construction Soil Quality and Depth in accordance with BMP T5.13: <br /> Size of site and Jst-Construction Soil Quality and Depth (p.911). Cannot limit <br /> max impervious impervious area to <br /> 10% of the site. <br /> coverage leaves no - <br /> room for full all Dispersion in BMP T5.30: Full Dispersion (p.939), or <br /> infiltration. Dwnspout Full Infiltration Systems in accor an MP T5.10A: Down- <br /> spout Full Infiltration (p.905) This project is <br /> 2. Rain Gardens in accordance with BMP T5.14A: Rain Gardens (p.915), cexempt from MR#7 <br /> Bioretention in accordance with BMP T7.30: Bior ells, Swales Flow Control and <br /> Planter Boxes (p.959).The rain gard °- -`- -� - acility mus avtherefore does not <br /> Infeasible due to require these LID <br /> minimum horizontal projected surfa lack of space for ierflowwhich i. <br /> least 5% of the area draining to i flowpaths. BMP s be <br /> evaluated. <br /> 3. Downspout Dispersion Syst s in accordance with BMP T5.10B: Down- <br /> spout Dispersion Systems (p.905) <br /> 4. Perforated Stub-out Connections in accordance with BMP T5.10C: Per- <br /> forated Stub-out Connections .90 <br /> Other Hard Surfaces: Yes. Flows will be <br /> directed to a <br /> 1. Full Dispersion in accordance witl combined spersion (p.939) <br /> 2. Permeable pavement1 in accordai stormwater/sewr Permeable Pavements <br /> (p.917), or Rain Gardens in accorc utility main on 4A: Rain Gardens <br /> (p.915), or Bioretention in accordaColumbia Ave. : Bioretention Cells, <br /> Swales, and Planter Boxes (p.959).The rain garden or bioretention facility <br /> must have a minimum horizontal projected surface area below the overflow <br /> which is at least 5% of the area draining to it. <br /> 3. Sheet Flow Dispersion in accordance with BMP T5.12: Sheet Flow Dispersion <br /> (p.908), or Concentrated Flow Dispersion in accordance with BMP T5.11: Con- <br /> centrated Flow Dispersion (p.905). <br /> List#2: On-site Stormwater Management BMPs for Projects Triggering <br /> Minimum Requirements #1 through #9 <br /> For each surface, consider the BMPs in the order listed for that type of surface. <br /> Use the first BMP that is considered feasible. No other On-site Stormwater <br /> 1This is not a requirement to pave these surfaces.Where pavement is proposed, it must <br /> be permeable to the extent feasible unless full dispersion is employed. <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume I- Chapter 2-Page 57 <br />