Laserfiche WebLink
area. <br /> Figure HI-3.1.8 Perforated Stub-Out Connection <br /> random fill <br /> ..'rf'*n::'ainr:�tij'pia"r'.c'.yS�A.>�.'1��' ��` <br /> 6" •syr'; j;,,; `,: • filter fabric <br /> IT `'-���.1 �•�.1y- 4 pert pipe <br /> 18"min. �, w� <br /> .-r4",mm Eaa�� '41-r.1�, 1 Y2'-%a"washed rock <br /> elikeielr• "Nose" <br /> 24"min. <br /> Trench X-Section <br /> slope —e <br /> to road <br /> drainage system <br /> 2'x 10' <br /> level trench <br /> w/perf pipe <br /> Plan View of Roof <br /> NOT TO SCALE <br /> Figure III-3.1 .8 <br /> Perforated Stub-Out Connection <br /> DEPARTMENT OF Revised December 2015 <br /> ECOLOGY Please see http://www.ecy.wa.gov/copyright.html for copyright notice including permissions, <br /> State of Washington limitation of liability,and disclaimer. <br /> 2014 Stormwater Management Manual for Western Washington <br /> Volume Ill- Chapter 3-Page 466 <br />