My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2307 COLUMBIA AVE 2021-05-04
>
Address Records
>
COLUMBIA AVE
>
2307
>
2307 COLUMBIA AVE 2021-05-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2021 9:15:16 AM
Creation date
5/4/2021 9:02:32 AM
Metadata
Fields
Template:
Address Document
Street Name
COLUMBIA AVE
Street Number
2307
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Task 3—Field inspect the study area <br /> The study area has been inspected by the design team. The site is dirt only as the previously <br /> existing house has been demolished and the land excavated for the proposed development. There <br /> does not appear to be any drainage problems on the site. The field inspection was conducted <br /> mid-day, on December 17,2018. The weather was overcast. <br /> Task 4—Describe the drainage system, and its existing and predicted problems <br /> The drainage system appears to be functioning properly. There are no known drainage issues, <br /> and it is not anticipated that the current system will experience any future problems. <br /> This project intends to install a Perforated Pipe Stub-out Connection per BMP T5.10C for <br /> stormwater management and as such the existing stormwater and combined sewer utility should <br /> be up to date per the City of Everett maintenance. <br /> 3.1.4 Determination of Applicable Minimum Requirements: Vol 1,Section 3.1.4 <br /> This project proposes less than 5,000 square feet of new hard surface and thus triggers the <br /> evaluation of minimum requirements 1-5. <br /> 3.1.5 Preparation of Permanent Stormwater Control Plan: Vol 1, Section 3.1.5 <br /> • Existing Site Hydrology <br /> The site is currently vacant of structures and is primarily occupied by dirt. Runoff from the site <br /> likely disperses within the existing vegetated cover on the perimeter outside the property lines <br /> edging the street and is collected by the catch basin located in Columbia Ave. <br /> • Developed Site Hydrology <br /> The runoff on site after the proposed development is installed will be collected and conveyed to <br /> the combined sewer and stormwater utility on Columbia Ave. <br /> a. Summary Section <br /> This project proposes less than 5,000 sf of new and replaced impervious surface, and less than <br /> 5,000 sf of new and replaced pollution generating hard surface. This project intends to address <br /> minimum requirements 1-5. The Drainage plan provides details on the stormwater design for this <br /> project. <br /> b. Performance Standards and Goals <br /> This project is exempt from meeting the LID performance standard. <br /> c. Low Impact Development Features <br /> This project is exempt from meeting the LID performance standard and therefore does not <br /> propose any LID BMP's. <br /> d. Flow Control System <br /> Flow control is not required for this project. <br /> e. Water Quality System <br /> NA- <br /> f. Conveyance System Analysis <br /> Columbia Ave appears to have a conveyance system that is the combined sewer and stoitnwater <br /> utility. <br />
The URL can be used to link to this page
Your browser does not support the video tag.