My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8525 EVERGREEN WAY BURGER KING 2021-05-10
>
Address Records
>
EVERGREEN WAY
>
8525
>
BURGER KING
>
8525 EVERGREEN WAY BURGER KING 2021-05-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/10/2021 11:25:55 AM
Creation date
5/4/2021 10:41:28 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8525
Tenant Name
BURGER KING
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSIGHT ENGINEERING CO. <br /> November 1,2018 <br /> Paul McKee, Permit Services Manager <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> (425)257-8867 <br /> Re: Burger King—PW1709-047 <br /> IECO No. 18-0961 <br /> Dear Paul, <br /> The project referenced above is revised in response to the review comments dated September 21, <br /> 2018. The review comments are numbered on the letter and have been addressed in italics as <br /> follows: <br /> • Drainage Report <br /> o MR#1: Stormwater Site Plan Preparation <br /> o The City's previous review comments were not fully addressed. <br /> • Provide totals of new pollution generating hard surfaces,replaced <br /> pollution-generating hard surfaces, effective impervious surfaces, and <br /> converted vegetated areas. <br /> • Provide these totals in a table,with a breakdown between <br /> right-of-way (ROW) and parcel-based areas and breakdown by <br /> TDA area. <br /> • Also show these totals graphically in an exhibit, allowing for <br /> review and cross-check of these totals. <br /> The areas listed above have been broken down as requested and listed in a set of <br /> tables and maps provided in the drainage report and sheet 3.2 paving plan. <br /> Please refer to the end of section 3 of the drainage report for the areas (pages 16- <br /> 18 with the maps following those pages). <br /> o Page 1 states that the List#2 approach was used to satisfy Minimum Requirement <br /> #5, but page 9 states the LID Performance Standard approach was used. State <br /> which approach was actually used (one approach only), and use that selected <br /> PO Box 1478 • Everett, WA 98206 • Phone: (425) 303-9363 <br /> Fax: (425) 303-9362 • Email:info@insightengineering.net <br /> // <br />
The URL can be used to link to this page
Your browser does not support the video tag.